3.0 SCHEDULE <br /> � Upon approval of this Work Plan, the proposed scope of work can be completed in ; <br /> I3 <br /> approximately 4 weeks. The duration for each of the three tasks are as follows: <br /> a <br /> { Task 1. Planning and Permitting 1 Week <br /> I' <br /> 1 Task 2. Push-Point Soil and Groundwater Grab Sampling and Analysis 2 Weeks <br /> I � <br /> ry Task 3. Site Investigation Report 1 Week <br /> L I; <br /> I <br /> I <br /> p <br /> L <br /> I <br /> I: <br /> L <br /> f <br /> r <br /> i <br /> L <br /> t <br /> i <br /> f <br />{ I <br /> LJ ry <br /> k � 4 <br /> k a' <br /> 7 <br /> 1 <br /> I <br /> � <br /> l <br /> it <br /> I � t <br />� J <br />