Laserfiche WebLink
Wilbur Ellis Company page 2 <br /> 212 Industrial Dr., Stockton <br /> E <br /> The "Groundwater Sampling - Former Underground Tank Area" report (dated <br /> March 13, 1998) submitted to PHS-EHD by KRAZAN & Associates on March 17, <br /> 1998, recommended six (6) Geo-Probes be advanced around the former UGT <br /> area for collection of groundwater grab samples. The Geo-Probe / push-point r <br /> proposal may be included, but only as a screening tool in determining the <br /> placement of the wells. A workplan which includes the placement of at least <br /> three (3) monitoring wells for periodic sampling and determining the groundwater <br /> gradient direction must be submitted to PHS-EHD. <br /> The workplan to install the wells, the boring permit application, and the $89 <br /> fee shall be submitted to PHS-EHD before June 19, 1998. The field work is <br /> to start before June 30, 1998 and the report of findings is due within ninety <br /> (90) days of the end of the field work. <br /> You may direct your submittals to Michael Infurna, Senior REHS, and you may <br /> call him at (209) 468-3454 should have any questions or wish to discuss your <br /> site. <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> Michael J. Infuma Jr., Senior REHS Margaret Lagorio, REHS <br /> LOP / Site Mitigation Unit IV Supervisor <br /> MI/ <br /> c: D. Reynolds / R. & C. Hallanger-ETAL - 212 Industrial Dr., Stockton <br /> c: Pat Anderson - CVRWQCB <br /> c: Cathy Reed - Krazan &Associates, 123 Commerce Circle, Sac., 95815 <br />