My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011716
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JAHANT
>
6540
>
2900 - Site Mitigation Program
>
PR0545317
>
ARCHIVED REPORTS_XR0011716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 10:30:00 PM
Creation date
2/11/2020 9:32:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011716
RECORD_ID
PR0545317
PE
2952
FACILITY_ID
FA0005251
FACILITY_NAME
M L GRENZ
STREET_NUMBER
6540
Direction
E
STREET_NAME
JAHANT
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
00526003
CURRENT_STATUS
02
SITE_LOCATION
6540 E JAHANT RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOU-11-1991 14.11 FROM IREHTEK INC TO 9-1-9lb-9r2-1b83 N 04 <br /> Jim Thorpe Oil Company Proposal No, ST191-0132 <br /> October 31, 1991 Page 3 <br /> SCHE2MLK <br /> It is estimated that the project will require a total of 16 weeks to complete (4.0 months). <br /> Upon receipt of notice to proceed, TreaTek will initiate the scientific evaluation, soil hazardous <br /> oharactorization evaluetlon,work plan preparation and the permitting process. it Is anticipated that <br /> these activities will require a minimum of three to fire weeks. construotion of the treatmarit beds) <br /> and soil movement will require a minimum of one week and the remedial program Is anticipated to <br /> require six weeks, TWo weeks will be required for the confirmation sample analysis and an <br /> additional two weeks will be required for the preparation of the remedial report. <br /> TreaTek appreciates this opportunity to be of service to you and should you have any questions <br /> ragarding this matter, please do not hesitate to call me. <br /> Sincerely, <br /> TreaTek Inc. <br /> Erik A. Friedrich, REA, REP <br /> Project Manager <br /> Robert W. Mueller. aEA <br /> West Coast Regional Manager <br /> cc A.O. Ping. TreaTek Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.