Laserfiche WebLink
NOU-11-1991 14.11 FROM IREHTEK INC TO 9-1-9lb-9r2-1b83 N 04 <br /> Jim Thorpe Oil Company Proposal No, ST191-0132 <br /> October 31, 1991 Page 3 <br /> SCHE2MLK <br /> It is estimated that the project will require a total of 16 weeks to complete (4.0 months). <br /> Upon receipt of notice to proceed, TreaTek will initiate the scientific evaluation, soil hazardous <br /> oharactorization evaluetlon,work plan preparation and the permitting process. it Is anticipated that <br /> these activities will require a minimum of three to fire weeks. construotion of the treatmarit beds) <br /> and soil movement will require a minimum of one week and the remedial program Is anticipated to <br /> require six weeks, TWo weeks will be required for the confirmation sample analysis and an <br /> additional two weeks will be required for the preparation of the remedial report. <br /> TreaTek appreciates this opportunity to be of service to you and should you have any questions <br /> ragarding this matter, please do not hesitate to call me. <br /> Sincerely, <br /> TreaTek Inc. <br /> Erik A. Friedrich, REA, REP <br /> Project Manager <br /> Robert W. Mueller. aEA <br /> West Coast Regional Manager <br /> cc A.O. Ping. TreaTek Inc. <br />