Laserfiche WebLink
NOU-11-1991 14 10 FROM TREATEK INC TO 9-1-916-9?2-1633 R 03 <br /> r ,fim Thorpe Oil Company Proposal No. ST/91-0132 <br /> October 31, 1991 Page 2 <br /> TreaTek's remedial system will consist of one or more soil treatment beds lined with plastic. The <br /> 600 cu yds of soil are to be distributed In these beds with a thickness of no more than 2 feet. After <br /> the soils have been distributed within the treatment bed, the soils will be inoculated with batch <br /> cultured microorganisms prepared and provided by TreaTek, Upon Inoculation, the soil's moisture <br /> and nutrient supply will be adjusted as required and the beds will be tilled, After tilling, a black <br /> plastic cover will be placed on top of the bad to minimize moisture loss, Optimize the soil <br /> temperature and reduce volatile emissions On a bi-weekly basis the soil will be t3llsd and the <br /> nutrient supply and moisture will be supplemented as required This process will be continued until <br /> the petroleum hydrocarbon compounds have been degraded. it is anticipated, at this time, that the <br /> ramodiwl process will require approximately six weeks following the Inoculation of the soil. <br /> After approximately six weeks, 16 confirmation soil samples will be collected for analysis (1 sample <br /> per 50 cu yds plus 4 duplicates). These samples will confirm the completion of the remedial <br /> process <br /> Upon receipt of the analytical results, TreaTak will prepare a remedial report which will contain <br /> complete discussions of the remedial process as well as the confirmation sampling analytical results <br /> and recommendations for the dispersement of the soils. <br /> COST ESTIMATE <br /> TreaTa'k proposes to conduct the above described scope of work for a lump sum of 120,500.00. <br /> . This cost estimate represents the maximum amount for which TreaTek anticipates the activities <br /> described above can be completed. This cost estimate assumes that either the Jim Thorpe Oil <br /> Company or the current land owner will provide for the following: <br /> 0 Construction, less plastic liner. of the treatment bed area(s), consisting of leveling, <br /> berming, soli placement, etc, as required and instructed by TreaTek. <br /> 0 Tilling of the beds as required under the direct supervision of TreaTek employees <br /> a Provide an onsite source for potable water <br /> 0 Provide lnocuiaWfrutnent application equipment to meetTreaTek's Inoculant/nutrient <br /> application requirements. <br /> This cost estimate shall not be exceeded without prior authorization from the client <br /> Additionally, this cost estimate assumes a remedial duration of no more than six weeks and a <br /> maximum of I confirmation soil samples. If the actual remedial duration Is longer than six weeks, <br /> monthly charges of 51,435.00/month will be incurred Any additional soil sampling will be charged <br /> at $40 00/hr. for the sample($) collection with an analytical charge of $83.00/sample for TPH-G <br /> analysis and $83 00/sampla for BTX&E analysis <br /> This proposal and scope of work shall be governed by all provisions of the attached TreaTek <br /> Incorporated, hereinafter called the consultant, terms and conditions Our proposal and cost <br /> ##timate for the abOve mentioned scope of work will be honored for a period of 30 days After IS <br /> • days, we reserve the right to revise our proposal and cost estimate. <br />