My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011716
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JAHANT
>
6540
>
2900 - Site Mitigation Program
>
PR0545317
>
ARCHIVED REPORTS_XR0011716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 10:30:00 PM
Creation date
2/11/2020 9:32:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011716
RECORD_ID
PR0545317
PE
2952
FACILITY_ID
FA0005251
FACILITY_NAME
M L GRENZ
STREET_NUMBER
6540
Direction
E
STREET_NAME
JAHANT
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
00526003
CURRENT_STATUS
02
SITE_LOCATION
6540 E JAHANT RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Rinsale Hauler <br /> Name Jim Thor a Oil Inc. <br /> Address o x357 351 N. Beckman Rd <br /> City Loal State -Ca Zip X5241-0351 — <br /> Phone No {� � _ - 17 hauler ReglAratlui► # 266 <br /> C. Tank/PlplaS Hauler <br /> Name Satan as above <br /> Address <br /> City Stale Zip <br /> Phage No. ( � _ _ liauier Redislrallon # <br /> d Tank/Pipk$ D1sposal Site <br /> Hama clip zer Steel Products <br /> Address_t.2pOO f�aiszxa 83vd. <br /> City Ranclao Cogdowa State &�,__�_-__- 71p _ 97670 <br /> Phone No ( � ;1H5= 34 - LPA ih i <br /> e. Contaminated Soil Hazardous Waste Hauler <br /> Name Dillard Trucking <br /> Address '2911 Borers Rd BL-- 1 Bx✓<73�� <br /> City - - Byr-On. S'Ate �__ -__ Zip 94514 <br /> Phareu (415 ) _ISM-0567 )gouger Reglslrallon # _q_ <br /> . EPA CAD 981692809 <br /> 9. Describe the method (or purging and/or inerting of the tartk(s) <br /> Tank (a) and lime (a) will first be triple rinsed and pumped out. 'Plzen An appro- <br /> r ate amount of dry i e wtll bp, Added <br /> Tank a will be mmitored silLh <br /> ry ice will be added at a rate of 15 lbs. and 30 lbs. /1000 gal ca2. for alesel <br /> and gasoline respectively. <br /> 10 1123 Jho applicant provided the detection links that will be utilized In ilia suggested analybis? YES V1 NO # <br /> ._ --- <br /> Sec j2age-8 - - <br /> 11 Describe In detail how the soil and/or water samples beneath the tank's invert and plping will be ublaioed <br /> After the tank-(a) have been-reutovea, we will dig clown approximately 2 to 3 Eget <br /> Into undlsturbec!_ oil ►ipder e- r- ►ts—.ral-yani--piptcia Uxat in„ js mss;ellp"e <br /> trill be taken__fmfl tlig backhoe htickat a.i C.f,H_�3i� E�r1_rr�n r�F r�rr�r llll-u3p �cit{Lltl�d. <br /> Sam lin protocol is gutIllieAl " �,} <br /> and " Minh urn Verification Laboratory Analysis " sheets arrclosed. <br /> 12 Describe hover the excavation will be backilllcd with suitable rnaterlat (earth, sated, etc) upon rcniovai <br /> Hack fill of excavation will bg (!carte With apprariatte�. ma_t.er-ia <br /> _ of the Projects A d to L i I� u-- iim(In <br /> that time. Hack fill mate i id "Ifey Sh{1 Llpi $� 1 <br /> Is an accepted material ac proce u e re res an engineer s <br /> c—cmpac on report, It will be supprfie—d--as—Tt is made available to us ye <br /> eng neer n8 rm. <br /> Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.