Laserfiche WebLink
1313 f fandling of excavated soil: <br /> a) What material will be used to line and cover stockpile placed on the ground? <br /> ------Nr�a� riE1;#y�l[1�gllgfal,.-• ------- - ------ - - - <br /> b) Number of soil samples (0 sampiesfcuoic yard) to be collected and analysed from stockpile? <br /> 16 <br /> c) What will be the disposition of stockpile after analysis) <br /> If poll samples ape pleart, soil will a returned teJhQ- eXcaIyatI <br /> i ga on s oun a eterwrn nal ori of=tire best met.od or atment w 1 e de— <br /> er a ex en o con arana on s vet^ ed. <br /> 14 What Is the depth to groundwater? jh krlown <br /> Describa the source of information; <br /> 13 Are there any wells on this parcel or adjacent yroperlleO YfiS 0J <br /> r7ub <br /> OF WFU S DDS fANCF TO TANKS(S) <br /> Well A <br /> Well 175 ft <br /> on Well ft, <br /> ring WellA <br /> 16 Will the lank(s) pending closure be replaced with an aboveground or underground storage lank(s) and has the <br /> responsible party submitted a *Utter of Cornmltrrrent` to PIISIEUM <br /> InEnrmat_ion ]a not know by - � ,ronIxarto <br /> Page 6 <br /> elosplan (Rev 3/19/91) wp <br /> r <br />