My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
501
>
3500 - Local Oversight Program
>
PR0545337
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 7:30:12 PM
Creation date
2/11/2020 11:27:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545337
PE
3528
FACILITY_ID
FA0003629
FACILITY_NAME
ARCO STATION #434*
STREET_NUMBER
501
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03119028
CURRENT_STATUS
02
SITE_LOCATION
501 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r ,= ARCO Meeting Minutes <br /> August 8, 1994 <br /> Page 7 <br /> ARCO 6100,Tracy, (Margaret Lagorlo) <br /> Margaret asked ARCO what the status was on performing further off-site assessment to <br /> delineate gasoline hydrocarbons in soil. ARCO stated that they had submitted an access <br /> agreement to the owner of the property across Patterson Pass Road in June, 1993. The property <br /> owner requested that the agreement be revised to address property restoration following <br /> completion of the investigation/remediation. The agreement was revised and resubmitted in April <br /> 1994. ARCO or EMCON has not received any word from the owner. ARCO said that they would <br /> have EMCON resubmit the agreement for a third time. Margaret told ARCO to continue to include <br /> the status of obtaining access in future quarterly statusreports. <br /> The results of the depth to groundwater investigation conducted on the on-site production well <br /> was discussed. Margaret said she received a copy of the report presenting the findings of the <br /> investigation and is satisfied that groundwater beneath the site is under confined conditions and <br /> is at a depth (deeper than 150 feet and likely 200 to 300 feet)that hydrocarbons in the soil would <br /> not impact groundwater. <br /> ARCO 434, Lodi(Margaret Lagorio) <br /> BC sent a copy of the revised soil boring locations to Margaret. ARCO has received off site <br /> permission for the Church property to the north of the site and the proposed boring locations in <br /> the City of Lodi right of way. ARCO is pursuing but does not yet have permission for the borings <br /> on the south side of Kettleman Lane. Kyle says we should go ahead and schedule the drilling <br /> now and the County agreed. <br /> Margaret needs information concerning the Biofilter, specifically a description of the system and <br /> the results. BC will provide her with a copy of the papers that have been prepared for the <br /> system. Margaret indicates that she needs to be informed when modification to the system are <br /> being proposed and ARCO has provided notification via quarterly monitoring reports. <br /> Summary <br /> Should you have any questions or comments please contact me at (415)571-2469 so that we <br /> can make adjustments. <br /> Sincerely, <br /> Chuck Cannel <br /> Environmental Engineer <br /> cc: Chris Winsor, PAC-1291 <br /> Kyle Christie, San Mateo <br /> Elizabeth Thayer, CVRWQCB <br /> Jay Johnson, EMCON <br /> Jay Lucas, Brown and Caldwell <br /> �r <br />
The URL can be used to link to this page
Your browser does not support the video tag.