My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
501
>
3500 - Local Oversight Program
>
PR0545337
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 7:30:12 PM
Creation date
2/11/2020 11:27:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545337
PE
3528
FACILITY_ID
FA0003629
FACILITY_NAME
ARCO STATION #434*
STREET_NUMBER
501
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03119028
CURRENT_STATUS
02
SITE_LOCATION
501 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v <br /> August 9, 1994 ARCO Meeting Page 4 <br /> 225 South Cherokee Lane, Lodi ARCO Facility #750 <br /> PHS/EHD contact - Linda Turkarm <br /> Installation of the soil borin&vapor wells proposed for the alley way to the north and neortheast of the site <br /> is delayed pending access from the property owner. The current property owner of the alley is unknown <br /> because the City of Lodi has been in the process of returning this land to adjacent property owners. ARCO <br /> and/or consultants will reserrch the current property owner and request access. <br /> The air treatment system forte remediation at this site will be transferred from another site. ARCO will <br /> evaluate all applicable paraers(nearby water wells,total contaminant mass available to leach and impact <br /> groundwater, etc) to decide which site has priority for the air treatment system. <br /> Quarterly reports were discassed in general and an effort will be made to sumbit the reports in a timely <br /> manner and to provide adequate notice prior to the sampling events. <br /> 3425 N. Tracy Blvd., Tracy ARCO Facility #2093 <br /> PHSIEHD contact - Harlin Knoll <br /> The site has documented pe--roieum hydrocarbon soil and groundwater contamination dating back to April <br /> 1987. The contaminated�.mdwater plume has migrated off-site as evidenced in samples collected from <br /> MW8. Hydraulic controi of:he groundwater is necessary to prevent further off site plume migration. <br /> Additional off-site investie3zion is required to define the full extent of soil and groundwater contamination. <br /> A "Final Remediation Plan'milizing vapor extraction and possible groundwater extraction was submitted <br /> to this office in May 1993. Arco proposes to start-up the remediation system as soon as possible and to <br /> continue the off-site investizzrion characterizing the extent of contamination in the vicinity of MW8. Arco <br /> stated the off-site remediation may utilize the on-site vapor extraction system in the fixture. <br /> 25775 Patterson Pass Road, Tracy ARCO Facility 96100 <br /> PHSIEHD contact - Margaret La_vrio <br /> W. Robert Vieira has not:»responded to the letter sent in April 1994. In order to define the extent of <br /> soil contamination, anothe'access agreement letter will be sent to Mr. Robert Vieira, for drilling on his <br /> property. <br /> Remediation of this site will'a postponed until equipment from another site in San Joaquin County becomes <br /> available. <br /> 501 W. Kettleman Lane, Lodi ARCO Facility #434 <br /> PHS/EHD contact - Margaret La-jrio <br /> Brown & Caldwell will R,.--nit a plot plan of the proposed changes in the locations of the confirmation <br /> borings and other items priniously requested. -The installation of the monitoring well to replace MW2 will <br /> be scheduled immediately. Any of the confirrnationl borings on site and off-site (for which access <br /> agreements and PHS/EHD permits have been obtained) shall be drilled at that time_ <br /> Brown&Caldwell will pro-,ide a description of the biofilter being used to remediate the low concentrations <br /> of hydrocarbons emitted fro=the operating vapor extraction system. Matthew Turner of Brown&Caldwell <br /> agreed to meet PHS/EHD s;zrT at the site to explain the(components of the biofilter. The vapor.extraction <br /> system will continue to opcare until cleanup is deemed complete and/or the system is no longer effective <br /> as deemed by PHS/EHD_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.