My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
501
>
3500 - Local Oversight Program
>
PR0545337
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 7:44:45 PM
Creation date
2/11/2020 11:28:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545337
PE
3528
FACILITY_ID
FA0003629
FACILITY_NAME
ARCO STATION #434*
STREET_NUMBER
501
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03119028
CURRENT_STATUS
02
SITE_LOCATION
501 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27 <br /> i� <br /> 1. Certification by California Department of Fealth Services. <br /> 2. Intralaboratory check samples from EPA, commercial sources, and the I Internal <br /> Quality Control Officer. <br /> I <br /> 3. Regular performance and system audits conducted by the laboratory dir ictor and <br /> Quality Control Officer. <br /> PROJECT SCHEDULE <br /> II <br /> This section provides a schedule for completion of the work described in this work <br /> plan. The starring date of each phase of fieldwork will depend on review and approval of <br /> this work plan and on driller availability. I� <br /> ii <br /> On-Site Soil Characterization <br /> Borehole drilling and soil sampling will take 1 to 2 weeks to complete. Laboratory <br /> analyses will take an additional 2 to 3 weeks. A aatus report letter will be issu8d 4 to 5 <br /> weeks after receiving laboratory results. <br /> Groundwater Extraction Well i <br /> Borehole drilling, extraction well installati n, and well development will take <br /> approximately l week. The aquifer test will be conducted following installation of the <br /> groundwater extraction well and after resolving the issue of discharge of the treated water. <br /> The slug tests will take 1 to 2 days to complete. The pumping tests will requite 1 week <br /> to complete. Laboratory analyses of groundwa er samples collected during the step- <br /> drawdown test will take 24 hours. Laboratory analyses of groundwater samples collected <br /> during the constant discharge pumping test will take an additional 2 to 3 weeks. A status <br /> report letter will be issued 4 to 5 weeks after receiving the laboratory results. <br /> I� <br /> Off-Site Monitoring Wells ; <br /> Borehole drilling, monitoring well installation, well development, and groundwater <br /> sampling will take 1 to 2 weeks to complete pending the property owners' permission to <br /> drill. Laboratory analyses will take an additional 2 to 3 weeks. A status report 'letter will <br /> be issued 4 to 5 weeks after receiving laboratory results. <br /> Summary Report <br /> After completion of all the tasks described i 1 this work pian, a summary report will <br /> be issued, 4 to 5 weeks after the last status report letter is issued. �! <br /> .i <br /> r <br /> Ij <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.