Laserfiche WebLink
v I <br /> 29 <br /> 2. Updating equipment or procedures to be i sed on site based on new information <br /> gathered during the site investigation. <br /> 3. Inspecting all personal protective equipment (PPE) prior to on-site use. <br /> 4_ Assisting the PM in documenting compliance with the SSHP by completing the <br /> standard BC forms. ! <br /> 5. Assisting in and evaluating the effectiveness of decontamination procedures for <br /> personnel, protective equipment, sampling equipment and containers, acid heavy <br /> equipment and vehicles. <br /> 6. Enforcing the "buddy system" as appropriate for site activities. <br /> 7. Posting location and route to the nearest medical facility; arranging for <br /> emergency transportation to the nearest medical facility. �! <br /> 8. Posting the telephone numbers of local public emergency services; Le�, police <br /> and fire. <br /> 9. Stopping operations that threaten the health and safety of the field 11team or <br /> surrounding populace. i <br /> 10. Observing field team members for signs f exposure, stress, or other conditions <br /> related to preexisting physical conditions f team members. �! <br /> The following is a reference list of project contacts: 'I <br /> Client: Mr. Kyle Christi <br /> ARCO Products Company <br /> (415) 571-2434 <br /> Regulatory Agency: Mr. Gordon Bogs ° <br /> Regional Board <br /> (916) 361-5740 <br /> BC Project Manager: Mr. Larry Phillips <br /> (916) 444-0123 <br /> BC Health & Safety Officer: Ms. Pam Bare <br /> (916) 444-0123 <br /> BC Project Geologist Ms. Jeanne Wall erg <br /> and (916) 444-0123 <br /> BC Site Safety Officer: <br /> Subcontractor(s): To be determine <br /> J <br /> I� <br /> II <br />