Laserfiche WebLink
Mr Chuck Carmel <br /> August 15, 1994 <br /> Page S <br /> Work Anticipated During Second Quarter 1994 <br /> • Continue monitoring of SVETS and optimization of system performance <br /> • Preparation and submittal of fust quarter 1994 groundwater monitonng and <br /> remediation system evaluation report <br /> • Sampling of groundwater monitoring wells for second quarter of 1994 Sampling <br /> to be performed by GTI <br /> • Permitting of biofilter system as treatment system at the site <br /> • Submit work plan to the County to drill soil borings to confirm that remediation of <br /> the soil and groundwater beneath the site is complete <br /> • Prepare San Joaquin Air Pollution Control District reports detailin3 operation and <br /> destruction removal efficiency of the SVETS <br /> Please contact me at {916}444-0123 if you have any questions regarding this quarterly report <br /> Sincerely, <br /> BROWN AND CALDWELL <br /> I <br /> .� <br /> Matt Turner Pat G Cullen <br /> Project Manager California Registered Geologist #4932 <br /> MTT PGC kc <br /> Enclosures <br /> cc Mr Gordon Boggs, California Regional Water Quality Control Board, <br /> Central Valley Region <br /> Ms Laurie Cotulla, San Joaquin County Local Health District <br /> . Use or disclosure of data contained on this sheet is subject to the restriction specified at the beginning of this <br /> document <br /> 1318\REPORTs\1ST94QTR RPT <br />