Laserfiche WebLink
Mr Chuck Carmel <br /> ` March 23, 1994 <br /> Page 4 <br /> contamination at the site, the bioftlter system be permitted to remediate the remaining low <br /> soil vapor concentrations at the site As an interim measure, Brown and Caldwell will <br /> continue to optimize the operation of the current SVETS to maximize removal rates and <br /> decrease the concentration of petroleum hydrocarbons in the soil vapor beneath the site <br /> Brown and Caldwell further proposes the locating and drilling of soil borings to confirm <br /> that soil and groundwater contamination beneath the site has been addressed and the site <br /> is ready for closure <br /> SUMMARY OF WORK <br /> Work Completed Fourth Quarter 1993 <br /> • Continued monitoring SVETS and optimized system performance <br /> • Prepared and submitted third quarter 1993 groundwater monitoring and <br /> remediation system evaluation report <br /> • Sampled sitegroundwater monitoring wells for fourth quarter 1993 Sampling <br /> performed by Emcon <br /> • Prepared San Joaquin Air Pollution Control District reports detailing operation <br /> and destruction, removal efficiency of the SVETS <br /> • Prepared groundwater discharge repot is for the City of Lodi as part of the waste <br /> discharge permit <br /> Work Anticipated During First Quarter 1994 <br /> • Continued Monitoring of SVETS and optimization of system performance <br /> • Preparation and submittal of fourth quarter 1994 groundwater monitoring and <br /> remediation system evaluation report <br /> • Sampling of groundwater monitoring wells for first quarter of 1994 Sampling <br /> to be performed by Groundwater Technology, Inc. <br /> • Preparation of first quarter groundwater monitoring and remediation systems <br /> evaluation report <br /> Use or disclosure of data contained on this sheet is subject to the restriction specified at the beginning of airs <br /> document 74&JIREP0RTNVN0V93QTR RPT <br />