Laserfiche WebLink
MonierLifetile, LCC <br /> Lathrop <br /> Memo <br /> To: File Lathrop Environmental <br /> From: Carlos Carrillo <br /> Date: 10/26/2007 <br /> RE: Waste pile and Berm Inspection 4th quarter 2007 <br /> On Friday October 26, 2007 and inspection was made of the Lathrop waste <br /> pile and berm. The inspection was made on the perimeter of what used to be <br /> the berm for the whole berm was hauled away. There were no signs of pile <br /> water runoffs to the containment pond. An excavator was brought to the site <br /> and is working on leveling the ground so that we can dig in different zones <br /> of the site and find out if the material that was left there to level the site out <br /> is hazardous. The plan is to finish leveling out the site and then grate it with <br /> a slope so that we don't have to use a berm anymore. <br /> NOTE: 28551 tons of material were hauled off to the land fill from Lathrop. <br />