Laserfiche WebLink
MonierLifetile, LLC <br /> Stockton <br /> Memo <br /> To: File Stockton Environmental <br /> From: Brian McCarty <br /> CC: Steve Saldate, Sandra Glenn <br /> Date: 09/27/2007 <br /> Re: Waste pile and Berm Inspection 2nd Quarter 2007 <br /> On September 27th 2007 an inspection was made of the Stockton waste area and surrounding berm. <br /> The inspection was made while walking the circumference of the waste area. The concrete walls and <br /> asphalt berm are in good shape and are serving their purpose of retaining run off from rains. Tarps <br /> need to be repositioned over berm with new sand bags to hold them in place (Sand Bags have been <br /> ordered). The pile consists only of regrind material with a very small pile of boulders that are broken up <br /> on a daily basis.The berm does not show any signs of cracks or falling apart. Runoff around waste pile <br /> is being retained and is ponding around base of regrind pile. <br /> 1 <br />