Laserfiche WebLink
Copy of Lathrop Scrap Shipments 2007 the final take!! <br /> Juan Jimenez Trucking Summary <br /> Cost of <br /> Tons Weight Scale Pile <br /> Date Total Trucks Removed Cost for loads Surcharge Altamont Dressing <br /> 9/20/2007 2 47 $ 270.00 $ 10.00 $ 158.00 <br /> 9/21/2007 4 94 $ 540.00 $ 20.00 $ 316.00 <br /> 9/24/2007 4 94 $ 540.00 $ 20.00 $ 316.00 <br /> 9/25/2007 4 94 $ 540.00 $ 20.00 $ 316.00 <br /> 9/26/2007 2 47 $ 270.00 $ 20.00 $ 158.00 <br /> 9/27/2007 4 94 $ 540.00 1 <br /> 20.00 $ 316.00 <br /> 9/28/2007 4 94 $ 540.00 $ 20.00 $ 316.00 <br /> Totals 24 $ 3,240.00 $ 130.00 $ 1,896.00 $ <br /> Total Cost <br /> North East 9/24/2007 <br /> Total tons removed= 5564 <br /> - 135.00@loas+5.00 weight fee Juan Jimenez <br /> South West 9/24/2007 North 9/26/2007 <br /> West Side 9/24/2007 West 9/26/2007 <br /> :ter 1�.►5 r. <br />