Laserfiche WebLink
Scrap Tile Shipments to Altamont Landfill Monierlifetile,LLC 342 Roth Road Lathrop,CA 95330 <br /> Carrier: John R.Lawson Rock and Oil,Inc. Date: <br /> Raw Material Type: SCRAP TILE <br /> Directons:Safety is the priority. Driver to remain in truck at all times except for check in/out.Restrooms located in front office. <br /> Driver to sign in and out on this form for each load and record pertinent data(white columns). <br /> MLT personnel to com tete Altamont Landfill Waste Acceptance Form and give to Driver. Make copy for local records. <br /> LATHROP SCRAP LOADING LOG (PLANT REAR SECTION) <br /> I oral <br /> Weight Scale Scoops Total Sand Cement <br /> Truck Date Time in Time Out ailer Numb Driver Name Cost per load Surcharge yed Tons (Tons) (Tons) <br /> 1 /2007 8:15:00 AM 8:45:00 AM 501 208-a JJ 135..00 $ 5.00 6.0 23.40 17.78 5.62 <br /> 2 9/20/2007 1:15:00 PM 1:30:00 PM 501 208-a JJ 135..00 5.00 6.0 23.40 17.78 5.62 <br /> 3 135..00 $ 5.00 6.0 23.40 17.78 5.62 <br /> 4 9/21/20 6:35:00 AM 6:55:00 PM 501 1 208-a J.J 135..00 5.00 6.0 1 23.40 17.78 5.62 <br /> 5 9/21/20 8:55:00 AM 9:15:00 AM 501 208-a J.J 135..00 $ 5.00 6.0 23.40 17.78 5.62 <br /> 6 11:00:00 AM 11:12:00 AM 501 208-a J.J 135..00 5.00 6.0 23.40 17.78 5.62 <br /> 7 1:15:00 PM 1:35:00 PM 501 208-a J.J 135..00 $ 5.00 6.0 23.40 17.78 5.62 <br /> 8 135..00 5.00 6.0 23.40 17.78 5.62 <br /> 9 8:50:00 AM 9:05:00 AM 501 208-a J.J 135..00 $ 5.00 6.0 23.40 17.78 5.62 <br /> 10 9/24/20 6:25:00 AM 6:50:00 AM 501 208-a J.J 135..00 5.00 6.0 23.40 17.78 5.62 <br /> 11 9/24/20 10:55:00 AM 11:55:00 AM 501 208-a J.J 135..00 $ 5.00 6.0 23.40 17.78 5.62 <br /> 12 1:20:00 PM 1:35:00 PM 501 208-a J.J 135..00 5.00 6.0 23.40 17.78 5.62 <br /> 13 135..00 $ 5.00 6.0 23.40 17.78 5.62 <br /> 14 5 6:40:00 AM 6:55:00 AM 501 208-a J.J 135..00 5.00 6.0 23.40 17.78 5.62 <br /> 15 9/25/20 8:57:00 AM 9:12:00 AM 501 208-a J.J 135..00 $ 5.00 6.0 23.40 17.78 5.62 <br /> 16 9/25/20 11:00:00 AM 11:10:00 AM 501 208-a JA 135..00 5.00 6.0 23.40 17.78 5.62 <br /> 17 1:20:00 PM 1:45:00 PM 501 208-a J.J 135..00 $ 5.00 6.0 23.40 17.78 5.62 <br /> 18 0.00 0.00 0.00 <br /> 19 9/2 8:50:00 AM 9:12:00 AM 501 208-a J.J 135..02 $ 5.00 6.0 23.40 17.78 5.62 <br /> 20 10:00:00 AM 10:25:00 AM 501 208-a J.J 135..03 5.00 6.0 23.40 17.78 5.62 <br /> 21 501 208-a J.J 135..04 $ 5.00 0.00 0.00 0.00 <br /> 22 /2 6:40:00 AM 7:00:00 AM 501 208-a J.J 135..05 5.00 6.0 23.40 17.78 5.62 <br /> 23 9/27/20 9:00:00 AM 9:25:00 AM 501 208-a J.J 135..06 $ 5.00 6.0 23.40 17.78 5.62 <br /> 24 /2 11:05:00 AM 11:28:00 AM 501 208-a JA 135..07 5.00 6.0 23.40 17.78 5.62 <br /> 25 1:25:00 PM 1:45:00 PM 501 208-a J.J 135..08 $ 5.00 6.0 23.40 17.78 5.62 <br /> 26 0.00 0.00 0.00 <br /> 27 6:20:00 AM 7:00:00 AM 501 208-a J.J 135..08 $ 5.00 6.0 23.40 17.78 5.62 <br /> 28 / 9:05:00 AM 9:30:00 AM 501 208-a J.J 135..08 5.00 6.0 23.40 17.78 5.62 <br /> 29 11:20:00 AM 11:40:00 AM 501 208-a J.J 135..08 $ 5.00 6.0 23.40 17.78 5.62 <br /> 30 1:35:00 PM 2:12:00 PM 501 208-a J.J 135..08 $ 5.00 6.0 23.40 17.78 5.62 <br /> Daily Sub Total tons $ $ 2 631.80 480.17 151.63 <br />