My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012744
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
3500 - Local Oversight Program
>
PR0545339
>
ARCHIVED REPORTS_XR0012744
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 7:22:06 PM
Creation date
2/11/2020 4:43:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012744
RECORD_ID
PR0545339
PE
3528
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
02
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r+ <br /> Results of Initial Investigation and Work Plan December 18, 1990 <br /> ARCO Service Station No. 2076, Lodi,California AGS 30008.2 <br /> further investigation of soil conditions beneath the tanks. Vapor-recovery wells could be <br /> installed in these borings if remediation of soil is warranted. <br /> LABORATORY ANALYSES <br /> ® Soil samples collected from the bottom of the existing and proposed tank cavities will be <br /> submitted to a State-certified laboratory for analysis of TPHg by EPA preparation Method <br /> t 5030 and modified EPA Method 8015 and BTEX by EPA Method 8020. Soil sample <br /> collectedJfTom under the former leaded gasoline tank will be submitted for analysis of total 1 <br /> and orgacns-.lead. Laboratory results will be discussed with ARCO personnel and with <br /> ARCO's approval forwarded to the SJPHS. A copy of a signed Authorization to Release <br /> i . <br /> Analytical Data form is included in Appendix C of this work plan. The new tanks will be <br /> installed after the SJPHS receives the laboratory reports and approves tank installation. <br /> k Y f <br /> OBTAINING APPROVAL FOR TANK INSTALLATION <br /> With ARCO's approval, laboratory results and a sample location map will be provided to <br /> the SJPHS to expedite the installation of the new underground storage tanks. The letter of <br /> R; <br /> acknowledgment,included in Appendix C of this work plan, commits ARCO to submitting <br /> k <br /> either a Soil Contamination Work Plan or a report on the tank removal investigation within <br /> ;< <br /> 3 months of completing the field work. If laboratory results indicate TPHg concentrations <br /> { greater than 10 ppm and BTEX concentrations greater than 1.0 ppm remain in place at the <br /> ® base of either excavation,Applied GeoSystems will recommend that ARCO submit the Soil <br /> Contamination Work Plan within 3 months of completing the field work...The Work Plan <br /> _will describe proposed procedures for further delineation of hydrocarbons in soil not <br /> q � <br /> l <br /> `� 15 <br /> 4 <br /> APPIled 000SYWOMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.