Laserfiche WebLink
A <br /> mgq- <br /> M. Wme <br /> � ffi <br /> 3 <br /> Results of Initial Investigation and Work Plan December 18, 1990 <br /> ARCO Service Station No. 2076, Lodi,California AGS 30008-2 <br /> excavated. ARCO will then evaluate remedial options based on the results of the <br /> delineation. <br /> REPORT PREPARATION <br /> We will prepare a report summarizing our field methods,laboratory procedures,laboratory <br /> =F results, and conclusions. The report will also contain cross sections and maps (as <br /> r appropriate) to illustrate sample locations and the extent of excavation. The report will be <br /> Q submitted to the SJPHS within 90 days of the completion of the field work. Information <br /> gathered will be considered confidential and released only with authorization of ARCO. <br /> PROMICT PERSONNEI. <br /> F0 <br /> Mr.John Bailey Bobbitt,a Registered Geologist(R.G.4313)in the State of California,will <br /> be in charge of the project. Ms.Eloise Frick,Project Geologist,will manage field and office <br /> operations. Applied GeoSystems employs a staff of engineers,geologists, and technicians <br /> whose services will be used to see the project through to completion. <br /> REFERENCES CITED <br /> Applied GeoSystems. March 23, 1990: Site Safety Plan.Report No. 30008-IS. <br /> E <br /> Applied Geos stems. September 5, 1990. Work_Plan lirr ' <br /> pF Y F t4lgti,�bsurface Environmental { <br /> vests to i -Plan No.3000,3-1W. <br /> California Department of Water Resources. 1980.Ground-urateasins in California: <br /> ReQgrt to the LgiWature in Response Io_W_ate�ode &ction 12924. Bulletin 118-80. <br /> - State-af-California:-October-1989:-I&Aking- u d-F 'a - - - - --- -- - -- <br /> d T :' Guidelines for Site Assessment.Cleanup.and Underground Storage Tank Closure. <br /> I, <br /> F S 16 <br /> x. <br />