My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012744
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
3500 - Local Oversight Program
>
PR0545339
>
ARCHIVED REPORTS_XR0012744
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 7:22:06 PM
Creation date
2/11/2020 4:43:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012744
RECORD_ID
PR0545339
PE
3528
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
02
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> mgq- <br /> M. Wme <br /> � ffi <br /> 3 <br /> Results of Initial Investigation and Work Plan December 18, 1990 <br /> ARCO Service Station No. 2076, Lodi,California AGS 30008-2 <br /> excavated. ARCO will then evaluate remedial options based on the results of the <br /> delineation. <br /> REPORT PREPARATION <br /> We will prepare a report summarizing our field methods,laboratory procedures,laboratory <br /> =F results, and conclusions. The report will also contain cross sections and maps (as <br /> r appropriate) to illustrate sample locations and the extent of excavation. The report will be <br /> Q submitted to the SJPHS within 90 days of the completion of the field work. Information <br /> gathered will be considered confidential and released only with authorization of ARCO. <br /> PROMICT PERSONNEI. <br /> F0 <br /> Mr.John Bailey Bobbitt,a Registered Geologist(R.G.4313)in the State of California,will <br /> be in charge of the project. Ms.Eloise Frick,Project Geologist,will manage field and office <br /> operations. Applied GeoSystems employs a staff of engineers,geologists, and technicians <br /> whose services will be used to see the project through to completion. <br /> REFERENCES CITED <br /> Applied GeoSystems. March 23, 1990: Site Safety Plan.Report No. 30008-IS. <br /> E <br /> Applied Geos stems. September 5, 1990. Work_Plan lirr ' <br /> pF Y F t4lgti,�bsurface Environmental { <br /> vests to i -Plan No.3000,3-1W. <br /> California Department of Water Resources. 1980.Ground-urateasins in California: <br /> ReQgrt to the LgiWature in Response Io_W_ate�ode &ction 12924. Bulletin 118-80. <br /> - State-af-California:-October-1989:-I&Aking- u d-F 'a - - - - --- -- - -- <br /> d T :' Guidelines for Site Assessment.Cleanup.and Underground Storage Tank Closure. <br /> I, <br /> F S 16 <br /> x. <br />
The URL can be used to link to this page
Your browser does not support the video tag.