My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012744
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
3500 - Local Oversight Program
>
PR0545339
>
ARCHIVED REPORTS_XR0012744
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 7:22:06 PM
Creation date
2/11/2020 4:43:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012744
RECORD_ID
PR0545339
PE
3528
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
02
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
: <br /> W <br /> ® r`rte, <br /> �f � 0 LJ <br /> Appllea G&WVStems 4191•E Power Inn Road,Sacramento,CA 95826 (916)452.2901 <br /> • FREMONT a IRVINE •HOUSTON s BOSTON 0 SACRAMENTO Y CULVER CITY •SAN JOSE <br /> SITE SAFETY PLAN No. 30008-35 <br /> SUBSURFACE ENVIRONMENTAL INVESTIGATION <br /> at the <br /> ARCO Service Station No. 2076 <br /> t1t East Kettleman Lane <br /> gGU Lodi, California <br /> (December 17, 1990) <br /> INTRODUCTION <br /> This Site Safety Plan describes basic safety requirements for the subsurface environmental <br /> investigation. The provisions set forth in this Plan apply to the employees of Applied <br /> GeoSystems and its subcontractors working on this phase of the project. The subcontractors <br /> may elect to modify these provisions, but only to upgrade or increase the safety E <br /> 1 requirements, and only with the concurrence of Applied GeoSystems, as designated and <br /> accepted in writing. <br /> f <br /> f: This Site Safety Plan will address the expected potential hazards that may be encountered . <br /> on the worksite for this project. Field activities are planned to begin upon approval of the <br /> work plan by the San Joaquin County Environmental Health Division with the duration <br /> estimated at approximately 1 month after the start date. If changes in site or working <br /> conditions occur as activities progress, addenda to this plan will be provided by Applied <br /> GeoSystems. <br /> AUTHORITY FOR SITE SAFETY <br /> The Applied GeoSystems personnel responsible for project safety are the Project Manager <br /> and the Staff GeoIagist or Engineer. The I-lealth and Safety Coordinator is responsible.for <br /> the overall Applied GeoSystems Health and Safety Program and.may choose to audit the <br /> site forcompliance and take appropriate action to correct deficiencies. The Project <br /> Manager is responsible for implementing the provisions of this Plan,for providing a copy <br /> of this Plan to the Staff Geologist or Engineer, and for advising the Staff Geologist or t <br /> Engineer on health and safety matters. The Project Manager and Staff Geologist or ' <br /> Engineer have the authority to audit site activities for compliance with the provisions of this. <br /> Plan. They may suspend or modify work practices or dismiss subcontractors whose conduct <br /> does not meet the requirements specified in this Plan. <br /> The Staff Geologist or Engineer is responsible for communicating the information contained <br /> in this Plan to the Applied GeoSystems personnel assigned to.the project and to the <br /> responsible representative of.each subcontractor working for Applied GeoSystems on the <br /> project, <br /> } <br />
The URL can be used to link to this page
Your browser does not support the video tag.