Laserfiche WebLink
• � �,.' SNS �� � r <br /> 3 <br /> I{ <br /> Site Safety Plan December 17, 1990 <br /> ARCO Station No. 2076, Lodi, California AGS 30008-3S <br /> The Staff Geologist or Engineer will also act as the Site Safety Officer. As such, the Staff <br /> Geologist or Engineer is responsible for addressing the following items: <br /> o Implementing the Site Safety Plan, Company policy, and procedures <br /> O Requiring and maintaining adequate safety supplies and equipment inventory <br /> onsite <br /> �g o Conducting daily safety meetings and advising workers regarding hazards . <br /> o Site control, decontamination, and contamination,-reduction procedures <br /> o Reporting accidents or incidents <br /> The Staff Geologist or Engineer has the authority to suspend work any time he or she finds <br /> i that the provisions of the Plan are inadequate for worker safety. The Staff Geologist or <br /> Engineer will inform the Project Manager and the Health and Safety Coordinator promptly <br /> # of deficiencies within the Plan or individuals or subcontractors whose conduct is not <br /> consistent with the requirements of this Plan. <br /> MEDICAL SURVEILLANCE <br /> h pplied GeoSystems personnel and subcontractors engaged in project activities must <br /> participate in a medical surveillance program and must be cleared by the examining <br /> t . physician(s)to wear respiratory protection devices and protective clothing for working with <br /> I hazardous materials. The applicable requirements of Title 8,Section 5216,of the lifornia <br /> A4W9mty tive_Codg will be observed. The applicable requirements under 29 CFR <br /> 1910.120 of the fedi -al Administ .Ne Code will also be observed. <br /> SAFETY AND ORIEN'rA77ON MEETING <br /> Field personnel from Applied GeoSystems and its subcontractors will attend a. project . <br /> specific training meeting for safety issues and review the project tasks before beginning <br /> work. The meeting will be led by the Project Manager or Staff Geologist or Engineer. In <br /> addition, fit-testing of respiratory protective devices will be conducted as part of the safety <br /> orientation meeting when the use of a respirator may be required. <br /> { 2 - <br /> E <br /> Aptrllerl 000:ystems <br />