Laserfiche WebLink
. Mr Kyle Christie Project 0805-144 02 <br /> January 24, 1996 <br /> Page 2 <br /> collecting groundwater samples for subjective and laboratory analyses EMCON used these <br /> data to evaluate the gradient and direction of groundwater flow beneath the site <br /> On November 15, 1995, a technician from EMCON took water level measurements and <br /> collected groundwater samples from monitoring wells MW-I through MW-4 for subjective <br /> and laboratory analyses The technician did not observe floating product or product sheen <br /> on samples collected from the wells (see Table 1) Sampling and analysis procedures are <br /> presented in Appendix A <br /> The surveyed elevations of the top of casing and the depth-to-groundwater measurements <br /> (see Table 1) were used to evaluate the potentiometnc surface beneath the site On <br /> November 15, 1995, the direction of groundwater flow was toward the northwest with a <br /> gradient of approximately 0 02 (see Figure 3) The direction of groundwater flow is <br /> consistent with previous sampling events Groundwater elevation increased approximately <br /> 0 28 foot from the previous sampling event (August 1995) <br /> Groundwater samples from each well were analyzed for total petroleum hydrocarbons as <br /> gasoline (TPHG), and benzene, toluene, ethylbenzene, and total xylenes (BTEX) using <br /> • California Department of Health Services LUFT Method and Environmental Protection <br /> Agency Method 5030/8020, respectively The samples were analyzed at Columbia <br /> Analytical Services, Inc , in San Jose, California The results of analyses are summarized in <br /> Table 1 Copies of the chain-of-custody records and laboratory analysis reports are <br /> presented in Appendix B Results of analyses indicated TPHG and BTEX concentrations <br /> were below laboratory detection limits in groundwater samples collected from wells MW-1 <br /> through MW-4 <br /> ACTIVITIES PERFORMED DURING THE FOURTH QUARTER <br /> • EMCON performed quarterly groundwater sampling <br /> • EMCON compiled and evaluated groundwater monitoring data <br /> ANTICIPATED WORK <br /> • ARCO will continue to perform quarterly groundwater monitoring The next <br /> sampling event is tentatively scheduled for February 1996 <br />. CONCLUSIONS <br /> The groundwater flow direction was to the northwest, which is consistent with previous <br /> sampling events. Gasoline hydrocarbons were not detected in groundwater samples <br /> collected from monitoring wells MW-1 through MW-4 Gasoline hydrocarbons have not <br /> SACNN SPRM805\08051440 2DS-9 ftu 1 <br />