Laserfiche WebLink
Mr Kyle Christie Project 0805-144 01 <br /> February 13, 1995 <br /> Page 2 <br /> • <br /> GROUNDWATER MONITORING; FOURTH QUARTER 1994 <br /> Groundwater Technology, Inc , (GTI) of Concord, California., was contracted by ARCO to monitor <br /> the groundwater in the monitoring wells previously installed at the site, GTI subsequently forwarded <br /> their field notes and the laboratory reports to EMCON EMCON used these data to evaluate dissolved <br /> gasoline hydrocarbon concentrations and the flow direction and groundwater gradient <br /> On December 1, 1994, a technician from GTI took water level measurements and collected <br /> groundwater samples from monitoring wells MW-1 through MW-4 for subjective and laboratory <br /> analyses The technician did not observe floating product or product sheen on samples collected from <br /> the wells (see Table 1) <br /> The surveyed elevations of the top of casing and the depth-to-groundwater measurements (see <br /> Table 1) were used to evaluate the potentiometric surface beneath the site On December 1, 1994, the <br /> direction of groundwater flow was toward the northwest with a gradient of approximately 0 02 (see <br /> Figure 3) The direction of groundwater flow is consistent with previous sampling events. <br /> Groundwater elevation decreased approxunately 0 63 feet from the previous sampling event <br /> (September 1994) <br />•� Groundwater samples from each well were analyzed for total petroleum hydrocarbons as gasoline <br /> (TPHG), and benzene, toluene, ethylbenzene, and total xylene isomers (BTEX) using Environmental <br /> Protection Agency (EPA) Methods Modified 8015 and 5030/8020 The samples were analyzed at <br /> National Environmental Testing, Inc , in Santa Rosa, California The results of analyses are <br /> summarized in Table 1 Copies of the laboratory analysis reports are presented in Attachment A <br /> Results of analyses indicated TPHG and BTEX concentrations were below laboratory detection limits <br /> in groundwater samples collected from wells MW-1 through MW-4 <br /> ACTIVITIES PERFORMED DURING THE FOURTH QUARTER <br /> • Performed quarterly groundwater sampling <br /> ANTICIPATED WORK <br /> ARCO will continue to perform quarterly groundwater monitoring The next sampling event is <br /> tentatively scheduled for March 1995 <br /> CONCLUSIONS <br />. The groundwater flow direction was to the northwest Gasoline hydrocarbons were not detected in <br /> groundwater samples collected from monitoring wells MW-1 through MW-4 Gasoline hydrocarbons <br /> have not been detected in the monitoring wells since the morutoring program began, with the exception <br /> of MW-3, which contained total xylenes at a concentration of 0 7 ppb during fourth quarter 1993 <br /> SAC/P101080S108051440 IBM-94 PAS 3 <br />