My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
1301
>
3500 - Local Oversight Program
>
PR0545342
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 10:47:18 AM
Creation date
2/12/2020 8:53:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545342
PE
3528
FACILITY_ID
FA0000392
FACILITY_NAME
FLAMES LIQUOR
STREET_NUMBER
1301
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95242
APN
03104030
CURRENT_STATUS
02
SITE_LOCATION
1301 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Yf <br /> SITE CHRONOL GY <br /> FORMER FLAME LIQ ORS, INC. <br /> 1301 W. KETTLEMAN LANE, LODI <br /> LOP SITE CODE: 1342 <br /> CVRWQCB CASE h 391017 <br /> APN: 03104030 <br /> 06/30/1998 Three gasoline USTs were removed from the site on this date. Soil sample <br /> results evidenced gasoline contamination. <br /> 07/20/1998 EHD filed a UAR on this dated. <br /> 10/30/2000 The date of Prelirninaiy Investigation nd Evaluation Report prepared by <br /> Advanced GeoEnvironmental, Inc. (AGE). The Report contains results from <br /> soil sampling, grab ground water sampling, and MWs installed. <br /> 06/21/2002 The date of Cone Penetrometer Testin Report prepared by AGE for work <br /> completed on-site in Nov. 2001. <br /> 07/23/2004 The date of Quarterly Report-Second uarter 2004 prepared by AGE which <br /> includes findings from the additional MW installation and additional <br /> soil borings that were completed. <br /> 02/10/2006 The date of Quarterly Report-Fourth Q anter 2006 prepared by AGE which <br /> includes additional MW installation an I soil vapor well installation findings. <br /> 01/31/2006 The date of Ground Water Batch Removal Report ofFindings-January 2006 <br /> prepared by AGE describing the removal of 6400 gallons of contaminated <br /> ground water. <br /> 05/17/2006 The date of Soil Vapor Extraction Pilot Test Report summarizing <br /> feasibility study activities. <br /> 11/21/2008 The date of Ground Water Extraction Well Installation Report prepared by <br /> AGE for the installation of 2 wells that ill be used for ground water <br /> pump and treat remediation. <br /> 03/13/2011 The date of No Further Action Request repared and submitted by AGE. <br /> 07/13/2011 EHD and CVRWQCB staff met on this date to review the request for closure <br /> and the site closure summary. Both agencies agreed that the site can be <br /> considered for NFAR. <br /> 08/26/2011 EHD completed a Case Closure Summary, Site Chronology, and prepared a <br /> 30-Day Closure Concurrence Request Letter for the CVRWQCB. <br />
The URL can be used to link to this page
Your browser does not support the video tag.