Laserfiche WebLink
I11 November 2004 <br /> i AGE-NC Project No 99-0624 <br />' Page 12 of 13 <br />' extraction well utilizing a 20-foot section of 4-inch diameter Schedule 40 PVC 0 020-Inch slotted <br /> well screen and blank well casing extended to surface grade Proposed well construction diagrams <br /> are depicted on Figures 11,12 and 13 <br /> IAfter Installing the well casing in each pilot boring, a filter pack material consisting of pre-washed <br /> #2/12 Lonestar sand will be added through the augers over the screen interval to approximately two <br /> I feet above the screened Interval Following placement of the filter pack, the water wells will be <br /> surged to assist in settling the filter pack Additional sand will be added If settling occurs <br />' A nominal two-foot bentonite seal (bentonite pellets or chips) will be placed above the filter pack <br /> to minimize the potential for grout penetration into the screened section of the well The bentonite <br /> seal will be formed by pouring bentonite pellets Into the annulus and allowing them to settle on the <br />' filter pack The bentonite pellets will be allowed to hydrate for a minimum of one-half hour prior <br /> to grouting <br /> The remaining annular space will be filled to within one foot of the ground surface with a cement <br /> grout The grout mixture will consist of Type UII portland neat cement and not more than 6 gallons <br /> of water per 94-pound sack of cement The grout will be placed by pumping through a tremae pipe <br /> A grout inspection will be scheduled with SJCEHD personnel <br /> I Following completion of the monitoring wells, well elevations and locations will be surveyed by a <br /> California-licensed surveyor relative to a City of Lodi elevation benchmark <br /> 55 WELL DEVELOPMENT <br /> Development of the proposed ground water wells will consist of a combination of bailing with a <br /> stainless steel bailer to remove the mayor portion of fine-grained sediment from Inside the well, <br /> surging to flush out or draw in sediment from the filter pack and additional ground water evacuation <br /> I (purging) with a Waterra bailing pump to complete the removal of fine-grained sediment <br /> Developmental purging activities will be continued until field parameter readings (pH, electrical <br /> conductivity, and temperature) have stabilized and purged water is visually sediment free <br /> 5 6 GROUND WATER AQUIFER PUMPING TEST <br /> A 24-hour ground water aquifer pumping test will be conducted at the site to induce a decline in <br /> static water level in the newly Installed ground water extraction well (screened 55 to 75 feet bsg) <br /> IPressure transducers will be deployed, at a minimum, in wells MW-1,MW-2,MW-3 and MW-4 to <br /> • measure the difference in ground water levels before well pumping versus time during ground water <br /> Advanced GeoEnviron mental,Inc <br />