Laserfiche WebLink
' 03 September 2002 <br /> AGE-NC Project No 99-0624 <br /> Page 2 of 4 <br />' 21 PERMITTING AND PRE-FIELD WORK ACTIVITIES <br /> Applicable site assessment and/or drilling permits will be submitted to the San Joaquin County <br /> Environmental Health Department(SJCEHD)and to the City ofLodi Public Works Department As <br /> required by SJCEHD permitting, a health and safety plan will be prepared in accordance with <br /> Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities (National <br />' Institute for Occupational Safety and Health Administration, U S Coast Guard and U S <br /> Environmental Protection Agency, 1985) Prior to drilling activities,each proposed drilling location <br /> will be clearly marked and a utility clearance obtained through Underground Service Alert <br /> 1 <br /> 2 2 SOIL BORING AND WELL PLACEMENT <br />' AGEro oses installation of wells an it <br /> p p d so boring placement in the following areas <br />' 0 One 2-inch diameter ground water monitoring well (MW-5) located between 120 feet and <br /> 140 feet south-southwest of monitoring well MW-2 and screened between 45 and 65 feet <br /> bsg, <br /> • One 2-inch diameter ground water monitoring well(MW-6)located between 60 and 80 feet <br /> northeast of monitoring well MW-2 and screened between 45 and 65 feet bsg, <br /> 0 One 2-inch diameter ground water monitoring well (MW-7) located between 5 and 10 feet <br /> east of monitoring well MW-2 and screened between 80 and 90 feet bsg, <br />' <br /> Proposed well locations ns are depicted in Figure 2, general lithology and the estimated extent of <br />' petroleum-impact to soil beneath the site is depicted in cross sectional views A A' in Figure 3 <br /> Procedures for well installation are presented in Section 3 2 <br />' Following well installation,each water well will be developed to maximize water flow into the well <br /> and minimize the amount of fine-grained sediment drawn into the well during pumping or bailing <br /> Procedures for well installation and development are presented in Sections 3 2 and 3 3,respectively <br /> 23 REPORT PREPARATION <br /> Results of the well installations will be presented in a report of findings The report will be in a <br /> format acceptable to the RWQCB (Appendix A - Reports, Tri-Regional Board Staff <br /> Recommendations for Preliminary Investigation and Evaluation of Underground Storage Tank <br /> Sites), and will be reviewed and signed by a California Registered Geologist <br /> IAdvanced GeoEnvironmental,Inc <br />