My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_1996 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 5:51:58 PM
Creation date
2/12/2020 10:13:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996 - 2004
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Preparation 3 Installation Instructions <br /> TLS-350 UST Monitoring System <br /> I "'� <br /> 6. Carefully lower probe into the riser pipe until the boot PRECAUTIONS:AVOID EYE AND SKIN CON- <br /> rests on the bottom of the tank. TACT. WEAR IMPERVIOUS GLOVES AND <br /> CAUTION: DO NOT ALLOW PROBE TO SAFETY GLASSES.USE ONLY IN WELL VEN- <br /> FREEFALL AND/OR SHARPLY IMPACT THE TILATED AREAS. <br /> BOTTOM OF THE TANK SHOCKTO THE PROBE 10. Tighten the cable bushing nuts on the probe riser cap <br /> FOOT WILL RESULT IN SEVERE PROBE DAM- and junction box to ensure a water-tight seal at the <br /> AGE. probe cable entry. <br /> 7. Feed the two-wire probe cable up through the riser pipe 11. Secure the riser locking cap to the top of the riser pipe. <br /> cap bushing and in through the junction box bushing. A padlock may be installed for added security. <br /> Leave enough slack in the cable between the cap and <br /> junction box to allow the cap to easily reach the riser F. PROBE INSTALLATION IN ABOVEGROUND <br /> pipe. In addition,leave enough slack under the riser STORAGE TANKS <br /> cap to allow the probe to rest on the bottom of the tank. <br /> Install each probe in an aboveground storage tank as <br /> 8. Using wiring nuts, connect the wires from the probe follows(see Figure 39;"Magnetostrictive Probe Installa- <br /> cable to the probe field wires in the junction box (see tion Requirements for Aboveground Storage Tanks"): <br /> Figure 38).Be sure to observe proper polarity between <br /> the probe and monitor wiring during installation.The WARNING:TO AVOID ELECTRICAL SHOCK <br /> conduit must be properly sealed in accordance with the 15WHICH COULD KILL YOU, BE SURE AC <br /> National Electrical Code(NFPA 70)and the Automo- POWER TO THE MONITOR IS OFF DURING <br /> tive and Marine Service Station Code (NFPA 30A) INSTALLATION. <br /> since they pass from a Class I,Division I or Division II <br /> area into a non-hazardous area. 1. Turn OFF power to the TLS system. <br /> 2. Make sure any liquid other than the product to be <br /> dispensed has been pumped out of the tank. <br /> WEATHERPROOF <br /> JUNCTION BOX 3. Be sure there is no sludge in the bottom of the tank. <br /> titRIGD t PER PROBE) Sludge can interfere with proper operation of the water <br /> " <br /> CONDUIIT = Bilk float. <br /> • <br /> T O F R O M STRAIGHT LIOUIDTIGHT <br /> CONNECTORS vC <br /> MONITOR PROBE (SUPPLIED WITH AST KIT) <br /> WEATHERPROOF <br /> • JUNCTION BOX WITH <br /> '/,INCH NPT THDS <br /> WhitI/, <br /> CUBIC INCH <br /> MINIMUM) <br /> EPOXV SEAL <br /> PER NFPA <br /> SPEC <br /> RISER DIMENSION <br /> Figure 38. Two-Wire Probe Field Wiring Installation SHOULD BE IS MIN <br /> TO THE BOTTOM OF FLEXIBLE METAL CONDUIT <br /> Diagram. THE RISER CAP SUPPLIED WITH AST KIT <br /> SEE NOTE BELOW <br /> 9. Seal wire nuts with epoxy sealant furnished with each d H API PIPE <br /> SCHEDULE dO <br /> probe, using one bag for two wire nut connections. <br /> (Refer to Figure 26, "Epoxy Sealant for Two-Wire <br /> Connections.") <br /> CAUTION: IF MORE THAN TWO WIRE NUT TANK MAGNETOSTRICTIVE <br /> CONNECTIONS SHARE AN EPDXY SEALANT PROBE <br /> BAG, THE CONNECTIONS WILL RESULT IN <br /> INACCURATE PROBE READINGS AND POSSI- <br /> BLY FALSE ALARM CONDITIONS. <br /> WARNING:EPDXY SEALANT MAY BE IR- <br /> RITATING TO EYES AND SKIN. MAY <br /> CAUSE SKIN SENSITIZATION IN SUS- <br /> CEPTIBLE INDIVIDUALS. MAY BE AB- <br /> SORBED THROUGH THE SKIN. EPDXY <br /> SEALANT CONTAINS EPDXY RESIN AND Note: Increase this minimum dimension if the tank <br /> diameter does not match the probe length. <br /> VINYL CYCLOHEXENE DIOXIDE. VINYL (Example:A 7'6"dia.lank will use an 8' <br /> CYCLOHEXENE DIOXIDE HAS CAUSED probe.The extra probeheight <br /> m <br /> h u twill be lodged <br /> in the riser pipe,which must be 6"longer <br /> SKIN CANCER IN ANIMAL TESTS. than the minimum in order to provide room.) <br /> Figure 39. Magnetostrictive Probe Installation Require- <br /> ments for Aboveground Storage Tanks. <br /> 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.