My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_1996 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 5:51:58 PM
Creation date
2/12/2020 10:13:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996 - 2004
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Before You Begin Introduction <br /> Important If you need to install a Precision check valve in an FE Petro pump, be sure to order a <br /> replacement O-ring[Figure 1 on page 4]for the check valve housing. <br /> If the correct hardware for precision line leak testing is not installed, the system will not <br /> detect leaks less than 3.0 gph. In this situation, the system will always pass 0.1 gph tests, <br /> but the results will not be valid. <br /> 5. To run 3.0 gph tests only with Red Jacket pumps,you must purchase one of the <br /> adjustable functional elements below.With this type of system,you can not do <br /> precision line leak testing. <br /> ❑ Standard version(Part No.323-006-5)--use with these fuels: gasoline,diesel, <br /> kerosene,gasoline with 10%ethanol,gasoline with 10%methanol and <br /> gasoline with 15%MTBE <br /> ❑ AG version(Part No.323-007-5)—use with same fuels as Standard version <br /> plus, 100%ethanol, 100%methanol,any mixture of gasoline with ethanol,and <br /> any mixture of gasoline with methanol <br /> You must also set the relief pressure on the adjustable functional element to 20-25 <br /> psi.Refer to the manufacturer's documentation for instructions. <br /> 0 0 <br /> o e <br /> 0-Ring(FE PETRO <br /> /part no.400211238 <br /> or 400333238) <br /> /Check Valve <br /> e <br /> rro <br /> G� <br /> Figure 1. Location of Precision Check Valve in FE Petro Pump <br /> 4 576013-902, Revision G <br />
The URL can be used to link to this page
Your browser does not support the video tag.