My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_1996 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 5:51:58 PM
Creation date
2/12/2020 10:13:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996 - 2004
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Field Wiring Requirements Installing Field Wiring and Conduit <br /> AWARNING <br /> This device is installed in equipment where potentially lethal voltages <br /> may exist. <br /> The following hazards exist: <br /> 1. Electrical shock resulting in serious injury or death may result if <br /> power is on during installation and the device is improperly <br /> installed. <br /> 2. Explosion, property loss, and/or equipment damage could occur <br /> if conduits do not enter the TLS-350 or TLS-350R console through <br /> their designated preformed knockouts. <br /> Observe the following precautions: <br /> 1. Before installing this device, turn off power to the system, <br /> including console and submersible pumps. <br /> 2. To protect yourself and others from being struck by vehicles, <br /> block off your work area during installation or service. <br /> Field Wiring Requirements <br /> Refer to Figure 4 on page 14 as you install the field wiring. <br /> Non-Bonded Metallic or PVC Conduit <br /> At sites where non-bonded metallic or PVC conduit is used,use 2-conductor 18 AWG <br /> shielded cable from the PLLD Interface Module in the monitor's intrinsically safe area <br /> to the Line Leak Sensor.Veeder-Root recommends Carol'' C2534 or Belden' 88760. <br /> Bonded Rigid Metal Conduit <br /> At sites where bonded rigid metal conduit is used,the installation does not require <br /> shielded cable.Wiring from the PLLD Interface Module to the Line Leak Sensor must <br /> 12 576013-902, Revision G <br />
The URL can be used to link to this page
Your browser does not support the video tag.