My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_1996 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 5:51:58 PM
Creation date
2/12/2020 10:13:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996 - 2004
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pump Port Strainer Installation (For In-Line Check Valves only) Installing the System <br /> Pump Port Strainer Installation <br /> (For In-Line Check Valves only) <br /> If you are using an in-line check valve,follow these steps to install the Pump Port , <br /> Strainer: <br /> AWARNING <br /> Product spillage could create serious environmental and safety <br /> hazards. <br /> Fire, explosion,or ground contamination could occur. <br /> 1. If the PLLD Check Valve is being installed at an existing site,drain <br /> the product pipeline using approved containers and procedures <br /> that will prevent product spillage. <br /> 2. Dispose of drained fuel properly. Used an approved suitable <br /> container for moving fuel. Dispose of fuel soaked materials <br /> properly and not into trash barrels that may be used by <br /> customers. <br /> 1. Turn off AC power to the submersible pump and TLS-350 or TLS-35OR system <br /> before beginning the installation. <br /> 2. If the system is equipped with an in-line shutoff valve,close the valve to reduce <br /> 0 <br /> the amount of drainage from the product lines.Collect drained fuel in an approved <br /> container. <br /> 3. Do one of the following: <br /> ❑ If the submersible turbine pump is equipped with a mechanical line leak <br /> detector,remove the leak detector and any related tubing and fittings.Plug <br /> unused port holes,except the LLD pump port,with pipe plug and UL- <br /> approved sealant suitable for the fuel involved. <br /> ❑ If the submersible turbine pump is not equipped with a mechanical LLD, <br /> remove the 2-inch mechanical LLD port plug. <br /> 4. Ensure that the sealing surface for the strainer o-ring is smooth and free from <br /> corrosion,pitting,and any material build-up[Figure 7 on page 22]. <br /> 5. Install the Pump Port Strainer in the mechanical LLD pump port[Figure 5]. <br /> Important uRr Seal the NPT threads only with a UL classified nontoxic pipe sealant suitable for the <br /> fuel type involved.Do not allow sealant to contact the strainer screen. <br /> 18 576013-902, Revision G <br />
The URL can be used to link to this page
Your browser does not support the video tag.