My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_1996 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 5:51:58 PM
Creation date
2/12/2020 10:13:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996 - 2004
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installing the System SwiftCheck Valve Installation(For Red Jacket, Tokheim, or Bennett Pumps) <br /> LINE LEAK SENSOR <br /> 0 <br /> VENT SCREW <br /> e <br /> e <br /> ' 2'PIPE TEE <br /> 0 <br /> IN-LINE CHECK VALVE <br /> Figure 6. In-Line PLLD Check Valve Installation <br /> 5. It is recommended that you install a shutoff valve between the PLLD pipe tee and <br /> the product pipeline. <br /> 6. A dielectric union must be installed between the in-line PLLD check valve and <br /> metal piping.A standard union may be used if the piping is fiberglass. <br /> 7. It is strongly recommended that a flexible piping element be used to complete the <br /> connection to the product pipeline. <br /> 8. Seal all joints with a UL-classified nontoxic pipe sealant that meets all national, <br /> state and local codes and that is suitable for the fuel involved. <br /> 9. Do not install piping exiting the PLLD check valve higher than the pump <br /> discharge port.This configuration creates an area that can collect air. <br /> SwiftCheck Valve Installation <br /> (For Red Jacket, Tokheim, or Bennett Pumps) <br /> The SwiftCheck Valve mounts directly into the mechanical line leak detector pump <br /> port.It eliminates the need to break product lines for installation and service. It also <br /> provides a means of precision testing the discharge o-ring and threaded discharge. <br /> Since theSwiftCheckValve replaces the existing mechanical device,it is suitable in <br /> applications where there is no sump. <br /> 576013-902,Revision G 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.