My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_1996 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 5:51:58 PM
Creation date
2/12/2020 10:13:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996 - 2004
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In-Line Check Valve Installation (For Red Jacket, Tokheim, or Bennett Pumps) Installing the System <br /> AWARNING <br /> Product spillage could create serious environmental and safety <br /> hazards. <br /> Fire, explosion, or ground contamination could occur. <br /> 1. If the in-line PLLD Check Valve is being installed at an existing <br /> site, drain the product pipeline using approved containers and <br /> procedures that will prevent product spillage. <br /> 2. Dispose of drained fuel properly. Used an approved suitable <br /> container for moving fuel. Dispose of fuel soaked materials <br /> properly and not into trash barrels that may be used by <br /> customers. <br /> b. Place a catch pan or container to collect draining product under the union <br /> (� where the piping will be disconnected from the submersible pump.Loosen the <br /> union and drain the pipeline using procedures that will prevent product <br /> spillage. <br /> c. Disconnect the pipeline at the union closest to the pump and remove existing <br /> plumbing between the product pipeline and submersible pump. <br /> 3. You must observe the following guidelines when installing the in-line PLLD check <br /> valve: <br /> a. The in-line PLLD check valve is threaded.for a 2-inch NPT fitting at both <br /> ends. <br /> b. The in-line PLLD check valve must be installed directly into the pump <br /> discharge port. <br /> c. The piston on the in-line PLLD check valve must open in the direction of fuel <br /> flow(to the dispenser). <br /> d. Use an UL approved sealant suitable for the fluid involved. Do not use <br /> excessive amounts of sealant on the check valve threads or mating <br /> fittings. Excessive sealant could cause check valve failure. <br /> 4. Install a 2-inch pipe tee directly onto the in-line PLLD check valve[Figure 6 on <br /> page 21] using sealant.The tee provides a port for the Line Leak Sensor and the <br /> product piping. It can be installed in any orientation,provided the Line Leak <br /> Sensor is perpendicular to(not in-line with)the pump outlet. <br /> 20 576013-902, Revision G <br />
The URL can be used to link to this page
Your browser does not support the video tag.