My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_1996 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 5:51:58 PM
Creation date
2/12/2020 10:13:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996 - 2004
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installing the System Manifolded Product Line PLLD Installation <br /> Important aw Seal the NPT threads only with a UL classified nontoxic pipe sealant suitable for the <br /> fuel involved. <br /> e LINE LEAK <br /> SENSOR <br /> OSWIFTCHECK <br /> ® VALVE <br /> e <br /> O <br /> B <br /> pumpsVtlpawN.ePS <br /> Figure 8. SwiftCheck Valve and Line Leak Sensor Installation <br /> Manifolded Product Line PLLD Installation <br /> TLS-350 or TLS-350R(Version 9/109 or later)software provides a feature that <br /> permits the use of the PLLD on product lines supplied by two tanks with two <br /> submersible pumps,up to a combined maximum of eight tanks and pumps. Please <br /> refer to the TLS-350 or TLS-350R Setup Manual(Manual No. 576013-62 or 576013- <br /> 880)for detailed instructions on selecting this option. <br /> Guidelines <br /> Review the guidelines below before you install the PLLD system.The primary tank <br /> has the lowest tank number in the manifolded set;therefore,the secondary tank is <br /> assigned the higher number. For additional parts you need when installing a <br /> manifolded PLLD system,see"Before You Begin"on page 3. <br /> ❑ At the secondary tank,you must provide for leak detection from the Non-vented <br /> Check Valve to the pump,because the PLLD system does not check this section of <br /> pipeline.The secondary tank may use a Mechanical LLD instead of secondary <br /> containment if desired; however,this will provide only 3.0 gph detection for the <br /> 576013-902,Revision G 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.