My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_1996 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 5:51:58 PM
Creation date
2/12/2020 10:13:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996 - 2004
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Manifolded Product Line PLLD Installation Installing the System <br /> section of pipeline between the"slave"pump and the check valve. The user is <br /> responsible for providing monthly or annual monitoring of this piping. <br /> ❑ If a Mechanical LLD is used on the secondary tank, it must provide a strainer <br /> screen(60-mesh or finer)to guarantee proper operation of the Veeder-Root Check <br /> Valve installed on this line. If you are not installing a mechanical LLD,you must <br /> install a Pump Port Strainer in the slave pump(s). <br /> ❑ Dielectric unions and flexible piping elements should be used as required by <br /> federal,state,and local requirements for the specific piping application. Location <br /> of unions may vary with configuration. <br /> ❑ A relay must be available on either a Four Relay Module or UO Combination <br /> Module to control the pump on the secondary tank.The PLLD Module will provide <br /> pump control output for the primary tank and the"Pump In"(Dispenser ON)signal <br /> for the set. <br /> Procedure <br /> To install the manifolded PLLD system,follow these steps: <br /> 1. Install the Pump Port Strainer on the slave pump per"Pump Port Strainer Installa- <br /> tion(For In-Line Check Valves only)"on page 18.Install the Non-vented Check <br /> Valve in the pump discharge port of the slave pump. <br /> Important Seal any threads using a UL-classified, nontoxic pipe sealant suitable for the fuel <br /> involved. <br /> 2. Install the rest of the system as shown in Figure 9 on page 25. If you are installing <br /> more than two tanks and pumps,connect the additional tanks and pumps the same <br /> way that you installed the secondary tank and pump(see"Tank 2"in Figure 9). <br /> 3. Wire the system as shown in Figure 10 on page 26.Follow procedures and <br /> guidelines described in"Pump Control Wiring for PLLD Controller Module"on <br /> page 16 and"General Wiring Practices"on page 34. <br /> 24 576013-902,Revision G <br />
The URL can be used to link to this page
Your browser does not support the video tag.