My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_1996 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 5:51:58 PM
Creation date
2/12/2020 10:13:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996 - 2004
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Line Leak Sensor Installation Installing the System <br /> Jacket pumps with 3.0 gph testing only,thread the Line Leak Sensor directly into <br /> the mechanical LLD port on the pump. <br /> LINE LEAK SENSOR <br /> 0 <br /> VENT SCREW <br /> e <br /> e <br /> 0 2'PIPE TEE <br /> a <br /> IN-LINE CHECK VALVE <br /> Figure 15. PLLD Line Leak Sensor Installation <br /> Important aw Seal any threads using a UL-classified, nontoxic pipe sealant suitable for the fuel <br /> involved. <br /> 2. Feed the Line Leak Sensor cable through the watertight cord grip on the Line Leak <br /> Sensor junction box. <br /> 3. Tighten the knurled nut on the cord grip to ensure a watertight seal. <br /> 4. Newer line leak sensors are equipped with a vent screw[Figure 15]to equalize <br /> internal pressure.If the line leak sensor is installed at altitudes above 2,000 feet, <br /> open the vent screw at least two turns,but not more than three turns.Then tighten <br /> the screw securely to prevent water from entering. <br /> Important g;5, Failure to follow this step where applicable could cause inaccurate pressure readings <br /> and false line leak alarms. <br /> 32 576013-902,Revision G <br />
The URL can be used to link to this page
Your browser does not support the video tag.