My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1467
>
2900 - Site Mitigation Program
>
PR0542408
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2021 5:20:09 PM
Creation date
2/12/2020 11:36:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0542408
PE
2950
FACILITY_ID
FA0024367
FACILITY_NAME
COCA-COLA BOTTLING COMPANY
STREET_NUMBER
1467
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
1467 EL PINAL DR
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k%J KLEINFELDER <br /> 3.2 Monitoring Well Installation <br /> Two temporary ground water monitoring wells will be installed to assess <br /> the presence of selected chemical constituents in the ground water. A <br /> permit for the installation of the monitoring wells will be obtained from <br /> the San Joaquin County, and as required by law (California State Water <br /> Code 13750) , an "intent to install ground water monitoring wells <br /> notification" will be filed with the Department of Water Resources (DWR) . <br /> A temporary ground water monitoring well will be constructed at the <br /> locations indicated on Plate 2. The estimated monitoring well depths are <br /> 40 to 50-feet. <br /> Proposed construction details of the temporary ground water monitoring <br /> wells are as follows: <br /> o The well casing will be 2-inch inside-diameter, flush-threaded <br /> joint, schedule 40 PVC pipe. <br /> o The PVC pipe will be steam-cleaned prior to installation. <br /> o The wells will be constructed in 8-inch diameter boreholes. <br /> o Well screen section perforation will be 0.020-inch factory-cut <br /> slots. <br /> o The screened section will be set 5-feet above and 15-feet below <br /> the depth where ground water is first encountered. <br /> 45-88-01 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.