My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
3200
>
2900 - Site Mitigation Program
>
PR0544641
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 1:39:52 PM
Creation date
2/12/2020 11:46:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0544641
PE
2965
FACILITY_ID
FA0001783
FACILITY_NAME
HOLMAN INVESTORS LLC
STREET_NUMBER
3200
Direction
E
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95212
APN
12202019
CURRENT_STATUS
02
SITE_LOCATION
3200 E EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIR ;iNTS ORDER NO. 5-01-055 -12- <br /> TRI VALLEY GROWERS PLANT NO. 4 <br /> STOCKTON, SAN JOAQUIN COUNTY <br /> segregated from the main waste stream. The report shall specify the means and methods of <br /> permanent off-site disposal of the high-salinity waste streams. <br /> h. By 30 March 2002, the Discharger shall submit a Monitoring Well Installation Report <br /> describing installation and development of the new monitoring wells. It shall be consistent <br /> with Attachment C. <br /> 2. The Discharger shall comply with the Monitoring and Reporting Program No. 5-01-055, which <br /> is a part of this Order, and any revisions thereto as ordered by the Executive Officer. <br /> 3. The Discharger shall comply with the "Standard Provisions and Reporting Requirements for <br /> Waste Discharge Requirements", dated 1 March 1991, which are attached hereto and by <br /> reference a part of this Order. This attachment and its individual paragraphs are commonly <br /> referenced as "Standard Provision(s)." <br /> 4. At least 90 days prior to termination or expiration of any lease, contract, or agreement involving <br /> the disposal or reclamation areas, used to justify the capacity authorized herein and assure <br /> compliance with this Order, the Discharger shall notify the Board in writing of the situation and <br /> of what measures have been taken or are being taken to assure full compliance with this Order. <br /> 5. The Discharger shall submit to the Board on or before each compliance report due date the <br /> specified document, or if appropriate, a written report detailing compliance or noncompliance <br /> with the specific schedule date and task. If noncompliance is reported, then the Discharger shall <br /> state the reasons for noncompliance and shall provide a schedule to come into compliance. <br /> 6. The Discharger shall use the best practicable cost-effective control technique(s) currently <br /> available to comply with discharge limits specified in this order. <br /> 7. The Discharger shall report promptly to the Board any material change or proposed change in the <br /> character, location, or volume of the discharge. <br /> 8. In the event of any change in control or ownership of land or waste discharge facilities presently <br /> owned or controlled by the Discharger, then the Discharger shall notify the succeeding owner or <br /> operator of the existence of this Order by letter, a copy of which shall be forwarded to this office. <br /> 9. The Discharger shall comply with all conditions of this Order, including timely submittal of <br /> technical and monitoring reports as directed by the Executive Officer. Violations may result in <br /> enforcement action, including Regional Board or court orders requiring corrective action or <br /> imposing civil monetary liability, or in revision or rescission of this Order. <br /> 10. A copy of this Order shall be kept at the discharge facility for reference by operating personnel. <br /> Key operating personnel shall be familiar with its contents. <br /> 11. If the Discharger can demonstrate to the satisfaction of the Executive Officer that higher BOD <br /> loadings than that specified in Effluent Limitation No. C.3 will not cause or contribute to cause <br /> waste constituents to leach into and degrade underlying groundwater, or cause any other <br /> violation of the terms and conditions of this Order, then this Order may be reopened for <br /> consideration of revision of BOD loading limits. The demonstration shall include the submittal <br />
The URL can be used to link to this page
Your browser does not support the video tag.