My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0000321
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
18826
>
2600 - Land Use Program
>
MS-89-64
>
SU0000321
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 5:13:32 PM
Creation date
2/12/2020 2:41:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0000321
PE
2622
FACILITY_NAME
MS-89-64
STREET_NUMBER
18826
Direction
N
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
LODI
Zip
95240
ENTERED_DATE
9/19/2001 12:00:00 AM
SITE_LOCATION
18826 N LOWER SACRAMENTO RD
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "C" <br /> ATTACHMENT TO THE ENVIRONMENTAL INFORMATION FORM <br /> FOR THE ARCO AM/PM FACILITY AT <br /> LOWER SACRAMENTO ROAD AND INDIANA STREET <br /> WOODBRIDGE, (SAN JOAQUIN COUNTY) CALIFORNIA <br /> OUR JOB #2809 <br /> Response to item 2 page 9 - <br /> The proposed project will not consist of any removal of structures or <br /> trees. Since the site is basically flat, there will be some minor cut and <br /> fill depending on the soil conditions. In addition, any vegetation removal <br /> will be strictly the existing scrub grasses. In addition, it will not be <br /> disturbing any of the existing drainage courses at and along the river edge <br /> and to the east. <br /> Response to item 3 page 9 - <br /> The average daily number of vehicles for this project will be about 800 - <br /> 1000 vehicles. These vehicles will be mainly cars and since the project is <br /> not close to a major highway, there will be a very small amount of large <br /> truck traffic. <br /> Since the project will be utilizing vapor recovery systems at each of the <br /> gas pumps, the only emmissions from the site will be basic, every day car <br /> emissions. <br /> The main switch for the ARCO project is a 600 amp panel. No natural gas <br /> will be used at this project. <br /> 2809.05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.