Laserfiche WebLink
• accident investigations; <br /> • recordkeeping; <br /> • personal protective equipment(PPE); <br /> • hazard assessment criteria; <br /> • site controls; and <br /> • general site safety requirements. <br /> All employees and subcontractors involved with this project are required to adhere to safe work <br /> practices and comply at all times with appropriate safety requirements of the USACE, federal <br /> and California OSHA, and Tetra Tech, Inc. <br /> 1.2 Field Activities <br /> The overall purpose of the field task is to remove train tracks, ballast, and TPH impacted soil at <br /> the site in two designated excavation areas; conduct confirmation soil sampling; backfill the two <br /> excavations; and conduct water sampling using a push probe sampler. <br /> Rough&Ready Island 2 Tetra Tech, Inc. <br /> Revised Draft HSP November 18, 1998 <br />