My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
305
>
2900 - Site Mitigation Program
>
PR0523599
>
COMPLIANCE INFO_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 4:53:28 PM
Creation date
2/12/2020 3:59:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 2
RECORD_ID
PR0523599
PE
2960
FACILITY_ID
FA0015929
FACILITY_NAME
PORT OF STOCKTON BLDG #16
STREET_NUMBER
305
STREET_NAME
FYFFE
STREET_TYPE
AVE
City
STOCKTON
Zip
95201
CURRENT_STATUS
01
SITE_LOCATION
305 FYFFE AVE BLDG 16
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2-1 <br /> Activity Hazard Analysis <br /> Activities Hazards I Recommended Controls <br /> Physical Hazards <br /> Shoveling debris Back pain and strain The SSHO will review with site personnel,the proper <br /> lifting techniques and procedures for avoiding back <br /> pains and strains when manually moving material. <br /> Excavating activities Confined space Prior to entry,excavations/trenches that exceed 4 feet <br /> in depth will be properly shored and monitoring will be <br /> performed. Tetra Tech employees and subcontractors <br /> will not enter excavations greater than 4 feet bgs. <br /> Removing railroad Heavy equipment Site personnel who are not operating equipment will <br /> tracks movement maintain a safe distance from earth moving equipment. <br /> Soil and debris Earth moving equipment Site personnel who are not operating equipment will <br /> movement including maintain a safe distance from earth moving equipment. <br /> excavation and site Hearing protection will be used by operators and <br /> restoration personnel in the vicinity of operating machinery. <br /> Water sampling Contact/Splash Wear PPE Modified Level D(see section 5.0) <br /> Throughout project Slip,trip,and falls Proper housekeeping will be maintained around the <br /> duration site. All small tools and materials will be kept out of <br /> walking areas. <br /> Throughout project Severe weather Site personnel will be responsible for monitoring <br /> duration weather conditions. Severe weather precautions are <br /> discussed in Section 2.2.3 of this plan. <br /> Throughout project Cold stress Site personnel will be trained to recognize signs and <br /> duration,especially symptoms of cold stress. Workers will be acclimated, <br /> during the winter periodically warmed up. <br /> months <br /> Throughout project Sun exposure Site personnel should use sunscreen lotions with SPFs <br /> duration of at least 15. <br /> 3.0 STAFF ORGANIZATION <br /> All project personnel (including subcontractors) are subject to this document. Supervisory and <br /> regulatory personnel who visit the project site during field operations are also subject to this HSP <br /> if proceeding in the work zone. <br /> All personnel are responsible for continuous adherence to the safety procedures during the <br /> performance of the work. In no case may work be performed in a manner that conflicts with the <br /> Rough&Ready Island 9 Tetra Tech, Inc. <br /> Revised Draft HSP November 18, 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.