My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
INSTALL_2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 11:32:18 PM
Creation date
2/12/2020 4:19:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2005
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill Containn OPW EVR Thread-on or OPW/POMECO EVR Multi-Port spill containers are <br /> certified for installation on OPW Phase I EVR systems. All fill ports in these spill containers <br /> feature enhanced 1 DK-2100-EVR vapor tight drain valves that exceed the EVR requirements for <br /> r a maximum vapor leak rate of 0.17CFH at 2.0 inches H2O.The vapor return spill containers <br /> feature a permanent plug installed in the drain ports as per EVR requirements. <br /> r Overfill Preventie The OPW 61 SO-400C-EVR series Overfill Prevention Valves are certified for <br /> installation on the OPW Phase 1 EVR system.The vapor tight EVR 61 SO's are designed to provide <br /> positive shut-off of product delivery, before an overfill condition occurs, per EPA requirements, <br /> without intervention from the transport driver.The valve features a sealed float pivot and a <br /> threaded lower tube connection and exceeds the EVR requirement for a maximum vapor leak <br /> rate of 0.17CFH at 2.0 inches H2O.The 61 SO-EVR series valve is installed in the base of the OPW <br /> EVR spill container with the patent pending 611SK Jack Screw device.This configuration allows <br /> ;,. liquid in the spill container to be drained directly into the drop tube,thereby isolating the drain <br /> valve from the tank ullage,eliminating a notorious leak point in previous systems. <br /> �J, q <br /> .. Tank BGiwi-ii vii The OPW/POMECO 6111-1400 Tank Bottom Protector is EVR certified <br /> �y, for installation at the bottom of the overfill prevention valve drop tube to help prevent the <br /> i underground storage tank from sustaining damage from erosion or tank gauging sticks. <br /> 5 Extra The OPW 53VML Ball Float, 233 Extractor and <br /> 61 T Fill Drop Tube configuration can be installed as an alternative to the 61 SO <br /> Overfill application.The installation of the Ball Float/Drop Tube system is <br /> identical to the 61 SO Overfill valve on Phase 1 Vapor Recovery Systems. <br /> SVV (Fill and Val::., OPW EVR Rotatable Swivel Adaptors are certified <br /> for installation on the fill and vapor ports on OPW Phase 1 EVR systems. OPW Swivel Adaptors <br /> Provide 360 degrees of rotation of any product or vapor recovery elbow to prevent the adaptors <br /> from loosening on the spill container risers. OPW Swivel Adaptors exceed the EVR requirement to <br /> maintain a minimum 360-degree rotation with an average static torque not to exceed 108 inch- <br /> pounds (9 foot pounds).The enhanced poppet system on the OPW 61 VSA-EVR vapor swivel <br /> adaptor provides a vapor tight seal when closed, per EVR requirements. <br /> Adaptor Tool An OPW 61SA-TOOL Adaptor installation tool is required to ensure proper <br /> installation of DPW Rotatable Swivel Adaptors,spill containers and threaded riser adaptors, per <br /> ..f EVR requirements.The 61 SA-TOOL includes provisions for the use of a torque wrench to facilitate <br /> accurate installation and testing. <br /> r!� 11cict r ye (Fill a. Vann, OPW EVR Dust Caps are certified for installation on <br /> OPW EVR certified Rotatable Adaptors. OPW EVR Certified Dust Caps feature <br /> enhanced ribbed seals and increased sealing forces to provide a bubble-tiht <br /> seal per EVR requirements.Available in Duratuff or low profile metal modes. <br /> MINION <br /> rp - lded Rises ^ 'T coal Adapte An OPW FSA-400 Threaded Riser Face Seal <br /> Adaptor is required to provide a flat,true sealing surface on threaded pipes where a gasket seal <br /> exists per EVR requirements. The FSA-400 is installed on the fill pipe riser below the spill <br /> container to provide a true sealing surface for the drop tube flange on the 61 SO-40OC-EVR <br /> overfill prevention valves. The FSA-400 is also required on tank gauging risers,though is optional <br /> on vapor risers and rotatable adaptors. <br /> Pressure Vacuum Ven The OPW 623V Pressure Vacuum Vent is certified for installation on the <br /> OPW Phase 1 EVR System.The 623V's are installed on the top of the vent pipes for underground <br /> fuel storage tanks. The vent cap and internal wire screen are designed to protect the tank vent <br /> lines against intrusion and blockage from water, debris or insects.A normally closed poppet in <br /> the valve opens at a predetermined pressure or vacuum setting to allow the tank to vent.The <br /> 623V exceeds the EVR requirement of a maximum vapor leak rate of 0.17CFH at 2.0 inches H2O. <br /> 9393 Princeton-Glendale Road • Cincinnati,Ohio 45011 Tel: (800) 422-2525 Fax: (800) 421-3297 • www.opw-fc.com <br /> c 2003,OPW Fueling Components P EVR-8/03-5M <br />
The URL can be used to link to this page
Your browser does not support the video tag.