Laserfiche WebLink
OPW 61SO OVERFILL PREVENTION <br /> The OPW 61 SO Overfill Prevention Valve is designed to prevent the overfill of underground <br /> storage tanks by providing a positive shut-off of product delivery. The shut-off valve is an integral <br /> part of the drop tube used for gravity filling. The OPW 61 SO allows easy installation (without <br /> breaking concrete)and requires no special manholes. <br /> The OPW 61SO is a two-stage shut-off valve. When the liquid level rises to about 95%of tank <br /> capacity, the valve mechanism is released,closing automatically with the flow. This reduces the <br /> flow rate to approximately 5 gpm through a bypass valve. The operator may then stop the filling <br /> process and disconnect and drain the delivery hose.As long as the liquid exceeds the 95%level, <br /> the valve will close automatically each time delivery is attempted. <br /> If the delivery is not stopped and the liquid rises to about 98%of tank capacity,the bypass <br /> valve closes completely. No additional liquid can Flow into the tank until the level drops below a o F'W <br /> reset point. `` <br /> Models of the 61 SO are available to meet virtually any UST application including two-point, i -.4 <br /> coaxial, poppeted coaxial and remote fill. The 61SO-3000 provides two-point overfill protection for eesTIFI<elo► <br /> 3"riser pipes,and the 61SO-1000 and 61SO-100C (CARB)feature a grooved-tube design for use <br /> with tank gauging systems. Methanol and CARB (vapor-tight) a roved models are also available. Look to.rn(sluroved products 9 9 9 Y PP OPW EVR approved products <br /> The OPW 61SO is approved by the New York City Fire Department. (Approval#4902). <br /> Features: <br /> ♦ Simple, Easy and Quick Installation- ♦ No Pressurization of the Tank- <br /> No excavation or special manholes Operates directly from liquid level. <br /> required. ♦ Will Accept a Dipstick for Gauging. <br /> ♦ Economical-Costs a fraction of ♦ Retrofits Directly- For both new and <br /> expensive, complicated and difficult- existing tanks with 3"or 4" fill risers. Certifications NY City Fire <br /> to-install valves. ♦ Quick Drain Feature-Automatically and Listings CARB Department EVR <br /> s Furnished Complete- Supplied with new drains hose when head pressure is <br /> upper and lower drop tubes, relieved. 61 SO Series Initial Approval <br /> mounting hardware and thorough ♦ Best Flow Rate in The Industry.` Certification #4902 VR-102 <br /> instructions for quick job site time. Letter Oct 88 <br /> ♦ Completely Automatic Operation- No Updated Approval <br /> prechecks to perform, no resets, and no Test-witnessed by Bowser-Morner,Inc.,an Letter#97-04 <br /> overrides to be broken or abused. independent laboratory. Results available -— <br /> upon request. 61SOM Approval <br /> Letter#90-5 VR-102 <br /> 61 SOP Approval <br /> Materials Seals: viton Letter#92-8 <br /> Valve body: cast aluminum Upper& lower Drop Tube: aluminum <br /> Float: nitrile rubber, closed cell foam Plastic parts: acetal <br /> Valve: aluminum Hardware: stainless steel <br /> IMPORTANT <br /> In order to prevent product spillage <br /> from the Underground Storage Tank <br /> (UST), properly maintained delivery <br /> Advantages of Overfill Prevention equipment and a proper connection at <br /> Compared to Overfill Warnin Systems: the tight fill adaptor are essential. <br /> om <br /> P 9_ Y Delivery personnel should be managed <br /> and trained to inspect delivery elbows <br /> ♦ Completely Automatic Operation- + Speeds Delivery Operations- and hoses for damaged and missing <br /> Does not rely on the alertness or speed Product flows unimpeded into the tank parts. They should always make certain <br /> of response of the delivery attendant until the hose"kick"that accompanies there is a positive connection between <br /> for certainty of overfill prevention. the valve shut-off provides a clear the adaptor and elbow. If delivery <br /> d Keeps the Top of UST"Dry," per signal that the liquid has reached the equipment is not properly maintained, <br /> EPA Requirements- Eliminating shut-off level. or the elbow is not securely coupled to <br /> the adaptor,a serious spill may result <br /> possible leaks at loose bung fittings Simple and Inexpensive Installation- when the OPW 61 SO closes, <br /> and the need for double containment In both two-point and coaxial fill causing a hazard and <br /> on vent lines. applications,no additional excavation, environmental contamination. <br /> * Does Not Rely on Pressure in the manholes or vent piping are required. NOTE: The OPW 61 SO is designed for <br /> UST to Stop Flow-Allowing faster fill use on tight-fill gravity drop <br /> times and reducing spill risk. applications only. Do not use <br /> for pressure fill applications. <br /> North America loll Free-TELEPHONE:(800)4222525•Fax:(800)421-3297•Email:domesttcsaleschopw4c.com <br /> International-TELEPHONE:(513)870-3315 or(513)870-3261•Fax:(513)8703157•Email:intisalest?opw4c.com <br /> O P W www.opw-rc.com <br /> Copyright 2004.OPW Fueling components•P.O.Box 405003•Cincinnati,OH 45240-5003•Printed in USA•3;04 <br />