Laserfiche WebLink
19. An accurate and drawn-to scale-as-built plan must be submitted to EHD prior to scheduling a final <br /> inspection. <br /> 20. Passing Enhanced Leak Detection(ELD)results must be received prior to the final inspection. <br /> Note: A separate permit.application is required to install ELD. <br /> 21. Contact Michelle Le, REHS (209) 468-9847 for inspections. See inspection checklist for the <br /> required inspections. All appointments must be scheduled 48 hours in advance. <br /> 22. This permit expires at the end of the calendar year. <br /> Please contact me at (209)468-9847 with any questions regarding this permit. <br /> Thank you, <br /> A4Li& Aw <br /> Michelle Le, REHS <br /> San Joaquin County <br /> Environmental Health Department <br /> Page 2 of 2 <br />