Laserfiche WebLink
MAY-19-95 FRI 16;39 CONDOR EARTH TECH FAX No 209E320773 P. 04 <br /> a Di s"-Lid* <br /> Mq IN.199 <br /> Pw <br /> In the event ftt la Matory analyses of the sop sample collected firm the capillary zone <br /> detects petroleum hydrocarbon constituents at or alcove th reported iaborMry detection Iin*s,a <br /> Waste Extraction Test (%%-n wilt be perfozmed on the sou sample. The WET pmovides a <br /> gaandWives assessment of the leachkle hydrocarbon cow tituents, if MY, that would psi a risk to <br /> grotmdwater quality at the site. <br /> Di Salvo Trucking has inmt eted Condor to law written correspondenee from SJUIJS,1 RD <br /> ton g with these proposed amendments to the Sep bet 27, 1994, approved work plan prior to <br /> sebeduling field work. The Installation of the moattor wX will be scheduled as soon as passible <br /> upon receipt of your leer of con=rence. Prior t'4 i Ration of the monitor well, a permit to <br /> install a monitor well wM be obtained and SJCPKSMM will be provided with 48 hours notice of <br /> field work. <br /> If you have any questions or need additional Infarmatkm please cW1 me at(ZM)668-9234. <br /> �C <br /> c R. Crm Robert J. OF l±A�t � <br /> evltrgist Calx orni is ed <br /> Profzuio nghxw <br /> #51592 <br /> cc Mr. Chulie Lawlor, Di Salvo Trucldng <br /> Elizabeth 7bayer, CRWQCB <br /> Barbra Anderrsan, SWQCB <br /> M1ALV0UATMXU dK3%ci r R <br /> �� GOAtaOx <br />