Laserfiche WebLink
FjDi Salvo Trucking-WP <br /> July 25,1995 <br /> Page-S- <br /> TABLE 1 <br /> Laboratory Detecti n Limits <br /> B T E X TEPH <br /> f ; <br /> Kerosene Diesel Motor <br /> Oil <br /> WATER 0.5 o.5 o.5 0.5 0.05 0.05 0.5 <br /> µg/1 ug/1 ,Ug/1 Yg/1 mg/1 mg/1 mg/1 <br /> 5.0 SCHEDULE <br /> Pumping of MW1 can begin after this work pl has been approved by SJCPHS,EHD <br /> Fand authorization to proceed has been obtained from Di Salvo Trucking. Work may begin <br /> within 5 days of final authorization to'proceed. The linal report can be submitted <br /> approximately 30 days following receipt of laboratory results. <br /> F <br /> 6.0 REPORTS <br /> F. A number of documents produced from the ac ivities outlined in this work plan will be <br /> incorporated into an investigation report to be presented to the SJCPHS,EHD by Di Salvo <br /> FTrucking. The report will include a chronology of aclivities conducted on site, a scaled map <br /> showing the location of all buildings, and field data stleets. A presentation and interpretation of <br /> the analytical data, and recommendations for further nvestigation, remediation, or site closure <br /> F will also be included in the report. If you have any q estions or need additional information, <br /> please call us at (209) 532-0351. .. IRIEU GEU(oGis <br /> Respectfully submitted, 1flH�fl. <br /> 1 <br /> F F <br /> Mar R. Crum John K Kramer <br /> Geo ogist California Registered Geologist <br /> #4228 <br /> F <br /> 1418\MWIPMP.WP <br /> t� CONDOR <br /> a <br /> s <br />