Salvo Trucking Facility-Gl'4 P <br /> September 27, 1994 <br /> Page-5- <br /> --3.3 Monitor Well Construction _ - <br /> F. w.2: _ <br /> The monitor wells will be constructed with 4-inc diameter, Schedule 40, flush-thread, <br /> machine-slotted PVC screen. The screen size will be selected based on the results of the soil grain ; <br /> size analysis. The screened interval will extend from a depth of.approximately 10 feet to-a depth of x <br /> pVC'°bottom^capa ill-be-placed-at;the-bottom-of the screen. <br /> approximately 25 feet.- A flush=thread <br /> Blank PVC casing will be installed above the screen to the ground surface. The well casing will be <br /> delivered to the site in its original packaging and steam-cleaned on site prior to use. .No glue or <br /> solvents will be used in construction of the well. <br /> A sand pack of Monterey sand will be placed in °he annular space-to approximately one foot <br /> _ - i <br /> above the screen. The sand size will be calculated based on the results of the soil grain size analysis. <br /> s Approximately 3 feet of bentonite pellets will be placed Bove the sand'to form a protective seal. The. <br /> bentonite will be hydrated using potable water. A seal o neat cement will be poured in the annulus <br /> from the bentonite seal to the ground'surface and a locking, water-tight traffic box will be installed at <br /> Ythe ground surface. Condor will provide locks and keys or each well. A diagram of the proposed <br /> A <br /> T well construction is shown in Figure 3,--Appendix A. <br /> r 3.4 Monitor Well Development -- _ <br /> Approximately one week following construction, the monitor wells will.be developed by ' <br /> Ris ur ing the groundwater until the discharge water.is free of sediment,-clear to the unaided eye and theN <br /> P g <br /> electrical conductivity, pH, and temperature-of the water itive stabilized. All well-development <br /> e ui ment will be cleaned prior to use.b. y washing in.a s lution of.non-phosphate detergent and <br /> laboratory-grade,'hydrocarbon-free water, and double-rinsing with hydrocarbon-free water. The water <br /> purged from each well will be placed in 55-gallon drums and left on site. All field instruments will <br /> be calibrated to the manufacturer's recommended standar s. <br /> 3.5 Groundwater Sampling — <br /> Groundwater samples will be collected within 3 c ays after development of the wells. Prior to <br /> purging, the water level in each'well will:be,measured-to the nearest 0,01 foot with a battery-operated, <br /> flat-tape, water-level.meter. The weM will be purged of at least three-well-casing volumes of water. <br /> -A water sample will be collected after fhe electrical cond ictivity, pH, and temperature have stabilized - <br /> F, and the.depth to water has recovered to-at least 80%.of tie pre-purge water.level. The water purged <br /> from each well will be discharged to 55-gallon-drums and left on site. <br /> CONDOR <br />