My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LARA
>
2019
>
2900 - Site Mitigation Program
>
PR0506762
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2020 4:16:44 AM
Creation date
2/13/2020 9:49:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506762
PE
2953
FACILITY_ID
FA0007611
FACILITY_NAME
TRI STAR HOMES LOT 51
STREET_NUMBER
2019
STREET_NAME
LARA
STREET_TYPE
CT
City
TRACY
Zip
95376
APN
23823010
CURRENT_STATUS
02
SITE_LOCATION
2019 LARA CT
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Safety Plan: Subsurface Investigation and Safety Plan Page 1 <br /> Remedial Excavation of Hydrocarbon-affected Soil <br /> Proposed Cintra Park Phase II Development, Tract 2705, Tracy, California <br /> 1.0 INTRODUCTION: SITE SAFETY PLAN <br /> This site safety plan (SSP) has been prepared in conformity with the Construction Testing & <br /> Engineering, Inc. (CTE) Health and Safety Program. It addresses activities associated with site <br /> assessment and remedial soil excavation at the referenced site. This SSP will be carried out during <br /> all field activities. The requirements and parameters identified in this SSP will be subject to <br /> modification as warranted by existing site conditions or as work progresses. However, no changes <br /> will be made without the prior approval of the Project Safety Officer. <br /> 1.1 Project Background <br /> Located at northwestern corner of the intersection of est Byron and Coral Hollow Roads the site <br /> was formerly occupied by a working farm. Figure I of the attached workplan is an index map <br /> showing the location of the site. <br /> 1.2 Previous and Proposed Work <br /> Two underground storage tanks(USTs)apparently form fly containing leaded and unleaded gasoline <br /> were excavated and removed on June 2, 1997. Soil samples were collected from the open excava- <br /> tions below the former UST locations and analyzed for: Total Petroleum Hydrocarbons-Gas (TPH- <br /> G); and, benzene, toluene, ethylbenzene, and total xyl nes (BTEX). TPH-G concentrations were <br /> 8,100 and 8,200 mg/kg in the analyzed samples. <br /> Under this phase of work the possible extent of hydrocarbon-affected soil will be assessed by <br /> excavation <br /> 2.0 SITE PERSONNEL AND RESPONSIBILITIES <br /> 2.1 Project Safety Officer <br /> The Project Safety Officer has overall responsibilitr for the development, coordination, and <br /> implementation of the SSP and its conformity with the C TE Health and Safety Program. The Project <br /> Safety Officer will also be responsible for field im lementation of this SSP. This includes <br /> communicating the site specific requirements to all site personnel and third parties and assuring <br /> compliance with the CTE Health and Safety Program If the Project Safety Officer is unable to <br /> perform these duties, the designated Alternative Safeq Officer will be responsible. <br /> WAPROJECTS110210AEN"01 MM <br />
The URL can be used to link to this page
Your browser does not support the video tag.