My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LARA
>
2019
>
2900 - Site Mitigation Program
>
PR0506762
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2020 4:16:44 AM
Creation date
2/13/2020 9:49:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506762
PE
2953
FACILITY_ID
FA0007611
FACILITY_NAME
TRI STAR HOMES LOT 51
STREET_NUMBER
2019
STREET_NAME
LARA
STREET_TYPE
CT
City
TRACY
Zip
95376
APN
23823010
CURRENT_STATUS
02
SITE_LOCATION
2019 LARA CT
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Safety Plan: Subsurface Investigation and Safety Plan Page 6 <br /> Remedial Excavation of Hydrocarbon-affected Soil <br /> Proposed Cintra Park Phase II Development, Tract 2705, Tracy, California <br /> 8.0 GENERAL SAFETY REQUIREMENTS <br /> The following requirements will also be observed: <br /> The Project Safety Officer has the authority to correct unsafe site conditions. All accidents, injuries, <br /> and potentially unsafe working conditions will be reported to the Project Safety Officer immediately. <br /> Eating, smoking, and drinking will be allowed only in designated offsite areas. Site personnel will <br /> wash their hands and faces thoroughly prior to eating or drinking. <br /> Employees will clean, sanitize, inspect, and maintain r spirators after each use. <br /> Fire extinguishers will be onsite for use on equipment r small fires only. <br /> An adequately stocked First Aid kit will be onsite at al I times during work activities. <br /> Practical engineering and geological information , e perience, and accepted practices will be <br /> employed as necessary to control aspects of site safety while carrying out the proposed site <br /> remediation work. <br /> 9.0 KEY PROJECT PERSONNEL <br /> a';a' S¢ska Eo-/s�a'i <br /> —.c #ta3a� S a I�� €zSi:F€ <br /> ; <br /> l ..a:3� aeable. Pro pct Personnel ;hot ,Numers :e ;3,. . ; <br /> Project Manager Jonathan Goodma her 800 546-4955 <br /> Project Safety Jonathan Goodma her (800)546-4955 <br /> Officer <br /> AIternative <br /> Safety Officer Kelly Thorpe 209 839-2890 <br /> Supervisor/ <br /> Offsite Coordinator Rod Ballard 800 546-4955 <br /> Client <br /> Contact: Michael Gallagher 510 838-1460 <br /> W APR07ECTMI023051ENRP01_WPB <br />
The URL can be used to link to this page
Your browser does not support the video tag.