My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LAMMERS
>
24100
>
2900 - Site Mitigation Program
>
PR0508110
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2020 4:11:40 AM
Creation date
2/13/2020 9:53:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508110
PE
2950
FACILITY_ID
FA0006134
FACILITY_NAME
POMBO RANCH
STREET_NUMBER
24100
Direction
S
STREET_NAME
LAMMERS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
24002002
CURRENT_STATUS
01
SITE_LOCATION
24100 S LAMMERS RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHRONOLOGY <br /> POMBO RANCH PROPERTY <br /> 24100 LAMMERS ROAD, Tracy <br /> 09/16/98 Phase 11 Environmental Assessmen conducted this date, 8 soil borings <br /> (B1 â B8) advanced for the collectio ri of soil and grab groundwater <br /> samples near the location of a former farm exempt underground storage <br /> tank (UST). <br /> 10/05/98 Date of Report of 9116198 work. Pet oleum hydrocarbon contamination <br /> in the soil and groundwater near the former UST. <br /> 11/06/98 Unauthorized Release Report#98-U42 and Prop 65#98-163 filed. <br /> 11/18/98 Notice of Responsibility and site letter sent to responsible party, Ernest <br /> J. Pombo. Site placed into Local Oversight Program. <br /> 12/08/98 SJCIEHD letter sent this date to responsible party directing submittal of <br /> a work plan to begin the site investigation. <br /> i <br /> 04/20/99 Received work plan for beginning site investigation this date. Dual phase <br /> plan, geoprobe soil borings followed by monitoring well installations. <br /> 05/17/99 Work plan approved by SJCIEHD. <br /> 07/06/99 Site investigation began this date; advancement of 4 more geoprobe soil <br /> borings (B9â B12)for the collection of soil and grab groundwater sample. <br /> 7116199 Analytical results from geoprobe samples submitted to SJCIEHD with a <br /> map of proposed monitoring well locations. <br /> 07/20/99 Three groundwater monitoring wells (MW1 âMW3) installed this date. <br /> 09/10/99 Date of report on July 1999 work. <br /> 11/22/99 Date of SJCIEHD letter directing the submittal of a Corrective Action Plan <br /> (CAP) including a feasibility study and calculations of contaminant mass. <br /> 04/07/00 Corrective Action Plan submitted this date. Several items needed to be <br /> clarified concerning the calculations of contaminant mass. <br /> 05/15/00 Additional information requested for AP submitted by consultant. <br /> 10/30/00 SJCIEHD requested review of CAP by Regional Board staff. <br /> 12/28/00 Date of Regional Board letter on CAR <br /> I <br /> 01/18/01 Date of SJC/EHD letter on CAP. Regional Board comments were <br /> incorporated into the response. Work plan for additional investigation <br /> to be submitted by 03105/01. <br /> 07/16/01 Date of SJCIEHD enforcement letter giving the responsible party <br /> 14 days to submit the overdue work plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.