Laserfiche WebLink
24100 Lammers Road <br /> page 2 <br /> I <br /> 6. Soil sampling should be attempted at all pre-determined sampling points. Use of a sand catcher is acceptable in <br /> zones where the soil is loose and/or saturated. <br /> 7. Soil sample analysis must include oxygenates, 1,2-dichloroethant and ethylene dibromide by EPA Method 8260. <br /> 8. A cost benefit analysis must be provided for the use of the oxygen-releasing compound. <br /> 9. Current depth to groundwater should be determined;a contingency plan for dewatering of the excavation area <br /> to achieve the over-excavation target depth may need to be prer ared. <br /> 10.Quarterly groundwater monitoring has been directed and must continue until directed otherwise by SJC/EHD. <br /> 11. Submit to SJC/EHD a well permit application and required$8 .00 permit fee. Forty-eight hours notice must be <br /> made to SJC/EHD before all fieldwork. The deadline for impk mentation of this work plan is March 28,2003. <br /> If you have any questions or comments please call Lori Duncan at 209) 468-0337. <br /> CA <br /> Lori Duncan,Senior REHS Nuel C. Henderson,Jr.,RG <br /> LOP/Site Mitigation Unit IV LOP/Site Mitigation Unit IV <br /> s <br /> I <br /> f <br /> I <br /> 3 <br /> cc: James Barton,CVR\VQCB <br /> Dave Butz,Bright Development <br /> Mike Kloberdanz,MJK&Associates <br /> i <br /> i <br /> i <br />