My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LAMMERS
>
24100
>
2900 - Site Mitigation Program
>
PR0508110
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2020 4:07:36 AM
Creation date
2/13/2020 9:53:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508110
PE
2950
FACILITY_ID
FA0006134
FACILITY_NAME
POMBO RANCH
STREET_NUMBER
24100
Direction
S
STREET_NAME
LAMMERS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
24002002
CURRENT_STATUS
01
SITE_LOCATION
24100 S LAMMERS RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> `Pombo Property <br /> Excavation and Monitoring Well installation <br /> site personnel, sampling methods, date and time of sampling, the number of well <br /> volumes removed before sampling, pr servatives added, and any filtration <br /> performed on samples. <br /> The samples will be refrigerated immedi tely for delivery to the laboratory and <br /> will under no circumstances be opened by anyone other than laboratory personnel. <br /> Chain of Custody records will be maintained at all times. <br /> 2.4 Soil Sampling <br /> All soil sampling equipment will be thoroughly steam-cleaned before and <br /> between sampling to prevent cross confianination. Relatively undisturbed soil <br /> samples will be taken at intervals of not rr ore than 5 feet in order to evaluate the <br /> subsurface materials, however, this sampling interval may be waived in saturated L��9 + <br /> sands in which sample recovery is not possible. uo�y <br /> Ljl' <br /> The soil samples will be taken using a California Modified Split Spoon sampler <br /> with brass liners. The sampler will be driven by a 140-pound hammer repeatedly <br /> falling 30 inches. The blow counts ne essary to drive the sampler will be <br /> recorded for each 6-inch interval to help evaluate the consistencies of the <br /> materials. <br /> The laboratory samples will not have head pace and will be immediately sealed in <br /> their liners using aluminum foil lined plas is caps. The remaining sample will be <br /> removed from its liner to be used as an aide to the on-site geologist in logging the <br /> material at that depth. <br /> Soil samples collected for analysis wi 1 be analyzed for Total Petroleum <br /> Hydrocarbons (gasoline & diesel), BTX& (Benzene, Toluene, Xylene, and Ethyl <br /> Benzene) and MTBE by method 8020. The minimum detection limits used for <br /> each analyte will be .005 mg/kg for BT &E, 0.01 mg/Kg for the Oxygenated <br /> compounds (0.1 mg/Kg for tertiary-But ol), 1.0 mg/Kg for gasoline, and 2.5 <br /> mg/Kg for diesel. <br /> 2.5 Groundwater Sampling <br /> A travel blank provided by the laboratory will accompany the sample vials from <br /> the time they are picked up from the lab to the time they are delivered to the lab. <br /> This travel blank should be listed on the Chain of Custody but will be analyzed <br /> only if all samples contain the same contaminants. <br /> All sampling equipment including the s ainless steel Geoprobe® screen point, <br /> pump, b ailer, and c ables, u sed b y s amplirig p ersonnel, will b e d isassembled, i f <br /> appropriate, and steam-cleaned prior to commencement of sampling. These <br /> procedures will also be followed between each well, sampling point, and at the <br /> end of the sampling day. De-ionized or o ganic-free water (also provided by the <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.